Dustproof net laying device for earthwork of building engineering foundation
A technology for construction engineering and laying equipment, which is applied in the direction of construction, building structure, and building material processing, can solve the problems of dust-proof net rollover and offset, low efficiency, and high work intensity, so as to avoid overturning and deviation Move, reduce the intensity of operation, and avoid scratches
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0028] The embodiment of the dust-proof net laying device for the foundation earthwork of this construction project is as follows:
[0029] see Figure 1-7 , a dust-proof net laying device for foundation earthwork in construction engineering, including a frame body 1, a mounting seat 2, a chute 3, a slider 4, a spring 5, a rotating shaft 6, a motor 7, a winding roller 8, a sleeve 9, a spacer Plate 10, dustproof net 11, buckle 12, cylinder 13, shrapnel 14, ext...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


