Overpass top-down construction method suitable for loess area
A construction method and regional technology, applied in the direction of bridges, bridge construction, erection/assembly of bridges, etc., can solve problems such as high cost, high safety risk, and long time, so as to reduce construction cost, reduce construction safety risk, and shorten construction time. The effect of duration
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0020] The specific implementation manners of the present invention will be described in further detail below in conjunction with the accompanying drawings.
[0021] Construction steps of the present invention are:
[0022] Step 1. Road maintenance: Excavate the cutting earth near the side of the mountain to the elevation of the original road surface, then widen and harden the side to form a parallel temporary access road on the side of the original road; after the access road is formed, use standardized Railings isolate the construction area from the access road, and set warning signs;
[0023] Step 2. Pile foundation construction: Excavate pile holes at the bridge pier, the diameter of the pile holes is the same as that of the pile foundation; then bind and weld the pile foundation reinforcement cage skeleton near the pile holes, and hang them into the holes one by one, and connect the main reinforcement between the nodes Use straight thread mechanical connection technology...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap