Construction process for subgrade soft soil treatment by riprap extrusion sludge method
A construction technology and roadbed technology, applied in soil protection, infrastructure engineering, construction, etc., can solve problems such as cost waste, affecting construction site construction, silt overflow, etc., to improve bearing capacity, reduce settlement, and reduce production costs. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] The present invention provides such figure 1 A construction process for treating subgrade soft soil by the riprap silting method shown includes a riprap silting treatment structure, and the riprap silting treatment structure includes a roadbed belt 1, and slope protection is provided on both sides of the roadbed belt 1 Ridge 2, the outer side of the slope protection ridge 2 is provided with a silt collection tank 3, the slope protection ridge 2 and the silt collection tank 3 are distributed parallel to the subgrade belt 1, and a flow channel opening is opened between the slope protection ridge 2 and the silt collection tank 3 4. The specific operation steps of using this structure to treat the soft soil of the roadbed are as follows:
[0028] S1: Excavate the subgrade zone 1, remove the hard objects on the surface of the subgrade, stir the silt to keep it in a fluid state, and tamp and level the base surface of the subgrade zone 1;
[0029] S2: Excavate the silt collec...
Embodiment 2
[0040] The present invention provides such figure 1 A construction process for treating subgrade soft soil by the riprap silting method shown includes a riprap silting treatment structure, and the riprap silting treatment structure includes a roadbed belt 1, and slope protection is provided on both sides of the roadbed belt 1 Ridge 2, the outer side of the slope protection ridge 2 is provided with a silt collection tank 3, the slope protection ridge 2 and the silt collection tank 3 are distributed parallel to the subgrade belt 1, and a flow channel opening is opened between the slope protection ridge 2 and the silt collection tank 3 4. The specific operation steps of using this structure to treat the soft soil of the roadbed are as follows:
[0041] S1: Excavate the subgrade zone 1, remove the hard objects on the surface of the subgrade, stir the silt to keep it in a fluid state, and tamp and level the base surface of the subgrade zone 1;
[0042] S2: Excavate the silt collec...
Embodiment 3
[0053] The present invention provides such figure 1 A construction process for treating subgrade soft soil by the riprap silting method shown includes a riprap silting treatment structure, and the riprap silting treatment structure includes a roadbed belt 1, and slope protection is provided on both sides of the roadbed belt 1 Ridge 2, the outer side of the slope protection ridge 2 is provided with a silt collection tank 3, the slope protection ridge 2 and the silt collection tank 3 are distributed parallel to the subgrade belt 1, and a flow channel opening is opened between the slope protection ridge 2 and the silt collection tank 3 4. The specific operation steps of using this structure to treat the soft soil of the roadbed are as follows:
[0054] S1: Excavate the subgrade zone 1, remove the hard objects on the surface of the subgrade, stir the silt to keep it in a fluid state, and tamp and level the base surface of the subgrade zone 1;
[0055] S2: Excavate the silt collec...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Diameter | aaaaa | aaaaa |
| Diameter | aaaaa | aaaaa |
| Modulus of resilience | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 