Construction process for subgrade soft soil treatment by riprap extrusion sludge method

A construction technology and roadbed technology, applied in soil protection, infrastructure engineering, construction, etc., can solve problems such as cost waste, affecting construction site construction, silt overflow, etc., to improve bearing capacity, reduce settlement, and reduce production costs. Effect

Inactive Publication Date: 2020-02-07
KUNMING RAILWAY CONSTR COMPANY OF CHINA RAILWAY NO 8 ENG GRP
View PDF6 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] However, when the pond backfill riprapping construction method provided in the above technical solution is applied to the soft soil of the roadbed, a large amount of silt will spill out, which will affect the construction of the construction site, and it is necessary to use multiple silt pumps distributed on the outside of the roadbed, resulting in waste of cost

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction process for subgrade soft soil treatment by riprap extrusion sludge method
  • Construction process for subgrade soft soil treatment by riprap extrusion sludge method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0027] The present invention provides such figure 1 A construction process for treating subgrade soft soil by the riprap silting method shown includes a riprap silting treatment structure, and the riprap silting treatment structure includes a roadbed belt 1, and slope protection is provided on both sides of the roadbed belt 1 Ridge 2, the outer side of the slope protection ridge 2 is provided with a silt collection tank 3, the slope protection ridge 2 and the silt collection tank 3 are distributed parallel to the subgrade belt 1, and a flow channel opening is opened between the slope protection ridge 2 and the silt collection tank 3 4. The specific operation steps of using this structure to treat the soft soil of the roadbed are as follows:

[0028] S1: Excavate the subgrade zone 1, remove the hard objects on the surface of the subgrade, stir the silt to keep it in a fluid state, and tamp and level the base surface of the subgrade zone 1;

[0029] S2: Excavate the silt collec...

Embodiment 2

[0040] The present invention provides such figure 1 A construction process for treating subgrade soft soil by the riprap silting method shown includes a riprap silting treatment structure, and the riprap silting treatment structure includes a roadbed belt 1, and slope protection is provided on both sides of the roadbed belt 1 Ridge 2, the outer side of the slope protection ridge 2 is provided with a silt collection tank 3, the slope protection ridge 2 and the silt collection tank 3 are distributed parallel to the subgrade belt 1, and a flow channel opening is opened between the slope protection ridge 2 and the silt collection tank 3 4. The specific operation steps of using this structure to treat the soft soil of the roadbed are as follows:

[0041] S1: Excavate the subgrade zone 1, remove the hard objects on the surface of the subgrade, stir the silt to keep it in a fluid state, and tamp and level the base surface of the subgrade zone 1;

[0042] S2: Excavate the silt collec...

Embodiment 3

[0053] The present invention provides such figure 1 A construction process for treating subgrade soft soil by the riprap silting method shown includes a riprap silting treatment structure, and the riprap silting treatment structure includes a roadbed belt 1, and slope protection is provided on both sides of the roadbed belt 1 Ridge 2, the outer side of the slope protection ridge 2 is provided with a silt collection tank 3, the slope protection ridge 2 and the silt collection tank 3 are distributed parallel to the subgrade belt 1, and a flow channel opening is opened between the slope protection ridge 2 and the silt collection tank 3 4. The specific operation steps of using this structure to treat the soft soil of the roadbed are as follows:

[0054] S1: Excavate the subgrade zone 1, remove the hard objects on the surface of the subgrade, stir the silt to keep it in a fluid state, and tamp and level the base surface of the subgrade zone 1;

[0055] S2: Excavate the silt collec...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
Diameteraaaaaaaaaa
Diameteraaaaaaaaaa
Modulus of resilienceaaaaaaaaaa
Login to View More

Abstract

The invention discloses a construction process for subgrade soft soil treatment by using a by riprap extrusion sludge method and particularly relates to the technical field of subgrade construction. Ariprap and displacement treatment structure is involved and comprises a subgrade belt. Slope protection ridges are arranged on the two sides of the subgrade belt correspondingly. Sludge collecting grooves are formed in the outer sides of the slope protection ridges correspondingly. The slope protection ridges and the sludge collecting grooves are all parallel to the subgrade belt. Flow channels are formed between the slope protection ridges and the corresponding sludge collecting grooves. According to the construction process, through riprap extrusion sludge treatment structure design, when the subgrade belt is subjected to riprap and displacement method treatment, the slope protection ridges prevent sludge from spilling over slopes, the sludge is made to enter the sludge collecting grooves from the flow channels and drained and collected through a sludge pump, remaining sludge is treated by using slaked lime, then overall filling and levelling are performed, soft soil can be hardenedeasily, and the stability of a subgrade structure is further improved; and compared with the prior art, the sludge treatment controllability is high, the production cost is low, and resources can beeffectively used.

Description

technical field [0001] The invention relates to the technical field of roadbed construction, more specifically, the invention relates to a construction technology for treating roadbed soft soil by riprapping and squeezing silt. Background technique [0002] Silt soil has low strength, high compressibility, low permeability, low foundation bearing capacity, easy deformation and unevenness after loading, high thixotropy and rheology. If such foundation soil is encountered during construction, it must be treated. There are many methods for treating silt soft soil foundation, one of which is riprapping, which belongs to the treatment method for solving the soft foundation of river alluvial deposits in marine facies, valley facies, lake marsh facies, and deltas. [0003] Throw a certain amount of crushed stones from the middle to both sides of the road base to squeeze the silt out of the roadbed to improve the strength of the roadbed. The crushed stones used should be large stone...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E02D3/08E02D3/10
CPCE02D3/08E02D3/10
Inventor 周瑞魏焰朱伯东何康邓斌
Owner KUNMING RAILWAY CONSTR COMPANY OF CHINA RAILWAY NO 8 ENG GRP