A fast recovery method for composite external insulation operation performance of power transmission and transformation equipment
A rapid recovery technology for power transmission and transformation equipment, applied in the field of power transmission and transformation, can solve problems affecting the normal operation of the power system, reduce the pollution flashover voltage level of the composite external insulation, and the operation performance of the composite external insulation is difficult to repair in time, and achieve The effect of preventing flashover
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] see figure 1 The invention provides a method for quickly recovering the operation performance of composite external insulation of power transmission and transformation equipment, which includes the following steps:
[0028] S1. Acquisition of air environment information. After sampling the polluted particles in the air during smog and rainy and snowy weather and sampling the rainy snow, the rainy snow is heated. When heated to 12 degrees Celsius, it passes through a 375-mesh filter. The net filters the solid particles and analyzes the composition of the solid particles. Under the conditions of smog, rain and snow in S1, the change of atmospheric composition will definitely change the pollution on the outer insulation surface of the power transmission and transformation equipment, affecting the power transmission and transformation. The degree of pollution on the outer insulating surface of electrical equipment, for the collection and filtration of haze and rain and snow...
Embodiment 2
[0035] see figure 1 The invention provides a method for quickly recovering the operation performance of composite external insulation of power transmission and transformation equipment, which includes the following steps:
[0036] S1. Acquisition of air environment information. After sampling the polluted particles in the air during smog and rainy and snowy weather and sampling the rainy snow, the rainy snow is heated. When heated to 15 degrees Celsius, it passes through a 385-mesh filter. The net filters the solid particles and analyzes the composition of the solid particles. Under the conditions of smog, rain and snow in S1, the change of atmospheric composition will definitely change the pollution on the outer insulation surface of the power transmission and transformation equipment, affecting the power transmission and transformation. The degree of pollution on the outer insulating surface of electrical equipment, for the collection and filtration of haze and rain and snow...
Embodiment 3
[0042] see figure 1 The invention provides a method for quickly recovering the operation performance of composite external insulation of power transmission and transformation equipment, which includes the following steps:
[0043] S1. Acquisition of air environment information. After sampling the polluted particles in the air during smog and rainy and snowy weather and sampling the rainy snow, the rainy snow is heated. When heated to 18 degrees Celsius, it passes through a 400-mesh filter. The net filters the solid particles and analyzes the composition of the solid particles. Under the conditions of smog, rain and snow in S1, the change of atmospheric composition will definitely change the pollution on the outer insulation surface of the power transmission and transformation equipment, affecting the power transmission and transformation. The degree of pollution on the outer insulating surface of electrical equipment, for the collection and filtration of haze and rain and snow...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
