A super-long truss type, construction method technology, applied in cranes and other directions, can solve the problems of time-consuming, labor-intensive, low-efficiency, and cumbersome installation of inclined supports, and achieve the effect of reducing construction time and improving construction efficiency.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] like Figure 1-3 As shown, a support construction method of an ultra-long truss type tower crane attachment system includes the following construction steps:
[0033] S1. Welding support frame: weld the support frame 3 on the two adjacent attachment rods 1 on the same side of the tower crane attachment system and need to be installed and support, and set a bolt hole in the center of the bottom of the support frame 3;
[0034] S2. Processing and installation of the beam: process the beam 4 of appropriate length, and weld the lug plate 41 in the middle of the beam 4. The two ends of the beam 4 are provided with bolt holes corresponding to the bolt holes at the bottom of the support frame 3 on the two adjacent attachment rods 1 , installing the crossbeam 4, so that the two ends of the crossbeam 4 are respectively fixedly connected to the bottom of the support frame 3 on the above-mentioned two adjacent attachment rods through locking bolts;
[0035] S3. Install the diagon...