Power battery failure early warning system and method
A power battery and early warning system technology, applied in electric vehicle charging technology, battery/fuel cell control devices, electrical devices, etc., can solve problems such as limited coverage of working conditions, increased cost of battery structure complexity, and inapplicability of real-time monitoring.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0048] Please see image 3 , image 3 A pressure difference-time fitting curve diagram provided for the embodiment of the present application.
[0049] In one embodiment, the cloud server can obtain the voltage information in the operating parameters of the power battery, and then analyze the change trend of the maximum pressure difference of the power battery under the same preset power percentage within the first preset time period according to the voltage information, according to This change trend analyzes whether the power battery will fail in the future.
[0050] As an example, the cloud server analyzes the voltage information in the operating parameters to obtain the power battery of an electric vehicle. The maximum voltage difference data of a single cell when the power percentage is 5% in the last 8 days is shown in Table 1:
[0051] Table 1
[0052]
[0053] A quadratic curve fitting is performed on the time-pressure difference data, and the fitting polynomial ...
Embodiment 2
[0057] Please see Figure 4 , Figure 4 A power-time fitting curve diagram provided for the embodiment of the present application.
[0058] In one embodiment, the cloud server can also obtain the charge information in the operating parameters, and analyze the charge decay rate of the power battery within the second preset time period according to the charge information; then, according to the charge decay rate and the power battery The maximum allowable attenuation rate of the power battery is analyzed to see if there is a risk of failure.
[0059] As an example, the power battery of an electric vehicle has a rated power of 51kWh. After the cloud server analyzes the charging information of the power battery, it can be obtained that the power battery has been charged from 30% to 80% in the last 8 days, as shown in Table 2 Shown:
[0060] Table 2
[0061] time (days) 1 2 3 4 5 6 7 8 Power (kWh) 25 24.8 24.5 24.5 24.1 23.5 23 22.6
[0062] ...
Embodiment 3
[0065] In one embodiment, the cloud server can also obtain the first charging parameter information (including charging current, voltage, etc.) Whether there is still charging current input, if there is still charging current input, then send the third warning information to the user terminal and the monitoring platform.
[0066] For example, when an electric vehicle is being charged, the battery management system detects that the maximum voltage of the power battery is 4.2V, and the maximum allowable voltage of the power battery of this model is 4.18V. In addition, there is still a charging current of 1A at this time. At this time, the cloud server will send an early warning message to the user terminal (such as the owner's mobile phone) and ring a reminder: "Your car is in an overcharged state, please stop charging as soon as possible!"; at the same time, the cloud server will also send a message to the monitoring platform. Corresponding warning information, after receiving...