250-T crane steel wire rope ground pre-tightening method
A technology of steel wire ropes and cranes, which is applied to hoisting devices, cranes, clockwork mechanisms, etc., can solve problems such as high construction risks and difficult operations, and reduce construction safety risks. The method is simple and convenient, and the cost of equipment is low. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] The following examples can enable those skilled in the art to understand the present invention more comprehensively, but the present invention is not limited to the scope of the described examples.
[0030] Such as Figure 1 to Figure 3 A 250T gram crane wire rope ground preloading method is shown, the specific preloading steps are as follows: including S1: main hook wire rope preloading; S2: auxiliary hook wire rope preloading; S3: luffing wire rope preloading; S4: dragging The wire rope is pre-tensioned.
[0031] S1: Main hook wire rope pretension:
[0032] S1.1: Each mechanism has been debugged. Before the wire rope is wound, all relevant inspections of each mechanism on the winch have been completed, and it can cooperate with the wire rope winding and tensioning action.
[0033] S1.2: Arrange steel plates and tensioning devices on one side of the crane. The opening center of the reel of the tensioning device is directly below the center line of the boom frame, whi...