Shield excavating method of tunnel containing boulder and bed rock salient stratum

A tunnel shield and boulder technology, which is applied in the field of tunnel shield excavation including boulders and bedrock raised strata, can solve problems such as delay in construction period, inability to excavate, and great impact of shield construction, so as to reduce the probability of damage and eliminate effect of influence

Inactive Publication Date: 2020-03-27
CHINA RAILWAY TUNNEL GROUP CO LTD +1
View PDF7 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The spherical weathered body (solitary rock) has a great influence on the construction of the shield. When the shield is advancing, the boulder is easy to roll along with the cutter head, hindering the excavation of the cutter head. Disc wear causes the strength and rigidity of the cutter head to decrease, making it impossible to excavate. Uneven force on the cutter head results in damage to the main bearing or damage to the seal, and damage to t

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0022] In order to make the above objects, features and advantages of the present invention more comprehensible, the present invention will be further described in detail below in conjunction with specific embodiments.

[0023] The special stratum includes fully weathered granite solitary rock development stratum and bedrock raised stratum. Among them, the fully weathered granite solitary rock developed stratum adopts the construction method of first detection and then treatment, and the bedrock raised section adopts drilling blasting and grouting reinforcement Construction method; the detection of the fully weathered granite boulder development stratum specifically adopts a composite detection method of electromagnetic wave tomography and ultrasonic tomography; the drilling and blasting uses a 100-meter drill to drill blast holes vertically downward from the ground , to stop at the raised top of the bedrock, and then use the crawler anchor machine to take holes in the bedrock ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a shield excavating method of a tunnel containing a completely weathered granite boulder development stratum and a bed rock salient section. Pertinent excavating methods are provided for the completely weathered granite boulder development stratum and the bed rock salient section correspondingly, the construction method adopting sequential detection and treatment is adoptedfor the completely weathered granite boulder development stratum, and the method of mid-sea explosion and grouting reinforcement is adopted for the bed rock salient section for construction. The damage probability of a cutterhead and a shield main bearing are greatly reduced, the influences on shield excavating are basically eliminated, and subsea tunnel shield construction is safely and smoothlycarried out.

Description

technical field [0001] The invention relates to a method for treating a special stratum in shield construction, in particular to a tunnel shield excavation method including boulders and bedrock raised strata. Background technique [0002] The spherical weathered body (solitary rock) has a great influence on the construction of the shield. When the shield is advancing, the boulder is easy to roll along with the cutter head, hindering the excavation of the cutter head. Disc wear causes the strength and rigidity of the cutter head to decrease, making it impossible to excavate. The uneven force on the cutter head results in damage to the main bearing or damage to the seal, and damage to the cutter head. In addition, during tunnel shield construction, hard boulders or bedrock protrusions often intrude into the shield tunneling route. If the shield tunneling is carried out directly, it is easy to cause damage to the shield cutterhead, causing danger and delaying the construction p...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E21D9/00E21D9/06E21D9/08E21D9/087G01V11/00F42D3/04
CPCE21D9/001E21D9/003E21D9/006E21D9/06E21D9/08E21D9/087G01V11/00
Inventor 孙振川王利明王凯韩伟锋李宏波李凤远张合沛褚长海潘东江陈瑞祥苏文德彭正勇徐黎明
Owner CHINA RAILWAY TUNNEL GROUP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products