Construction method of variable-section underground diaphragm wall
A technology of underground diaphragm wall and construction method, which is applied in the direction of sheet pile wall, foundation structure engineering, construction, etc. It can solve the problems of plastic pipe binding and positioning not firm, square caisson structure strength decrease, and welding bracket difficulty, etc. It is not easy to achieve Effects of displacement, shortened installation time, and convenient disassembly
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] Such as figure 1 Shown, the construction method of the underground continuous wall of a kind of variable cross-section provided by the invention comprises the following steps:
[0033] 1) Open the first lead holes at each corner position of the predetermined underground diaphragm wall; carry out concrete pouring to each first lead hole; open a plurality of second lead holes at intervals along the edge of the underground diaphragm wall; concrete pouring;
[0034] 2) Carry out the construction of the first lead hole at the four corners of the underground diaphragm wall at first, until the concrete pouring of the underground diaphragm wall at the corner is completed, and then carry out the second lead hole and underwater concrete pouring construction of the diaphragm wall in the middle section;
[0035] 3) Excavating soil to form a groove; 4) using a hole cleaning machine to clean up the groove until the sand content in the groove is less than 7%;
[0036] 5) Hoisting th...
Embodiment 2
[0040] Such as figure 2 , image 3 and Figure 4 As shown, the present invention also discloses a binding device, which includes an outer wire fixing sleeve 1 and an inner installation sleeve 2. The outer wire fixing sleeve includes a sleeve body 3, and an installation groove 4 penetrating both ends is opened in the sleeve body. The inner wall of the top of the installation groove is equipped with an upper conductive sheet 5, the inner wall of the bottom of the installation groove is equipped with a lower conductive sheet 6, the upper part of the sleeve is equipped with a positive terminal 7, and the lower part of the sleeve is equipped with a negative terminal 8 ; The upper conductive sheet is connected to the positive terminal through a wire, and the lower conductive sheet is connected to the negative terminal through a wire;
[0041] The inner mounting sleeve includes six equal-length ceramic support plates 9, the bottom ends of the six ceramic support plates are fixed t...