A kind of urban water supply system and water supply method based on big data

A technology of urban water supply and big data, applied in the waterway system, water supply pipeline system, sewer pipeline system, etc., can solve the problems of residents’ life impact, main water supply pipeline cut-off, failure to detect in time, etc., and achieve the effect of avoiding long-term residence deposition

Active Publication Date: 2021-11-02
郑州商学院
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] During the construction period of emerging cities, the occupancy rate is insufficient and the water utilization is insufficient. The long-term accumulation of drinking water in the water supply pipeline will cause scale deposition, which will easily cause water quality to deteriorate, and when the water quality deteriorates, it is often not found in time
[0004] In the traditional water supply system, once the main water supply pipeline is damaged, it will cause a large area of ​​water cutoff, which will have a great impact on the lives of residents.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A kind of urban water supply system and water supply method based on big data
  • A kind of urban water supply system and water supply method based on big data
  • A kind of urban water supply system and water supply method based on big data

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0034] Embodiment 1, a kind of urban water supply system based on big data, such as figure 1 with 2, including a water supply high-pressure tank and a main water supply pipeline 1 connected thereto. The urban water supply system also includes a circulation water pipeline 2 and an inspection well 4 arranged along the main water supply pipeline 1. Several branch water supply pipelines 5 are connected to the main water supply pipeline 1, and the branch The middle part of the water supply pipe 5 is connected to the low-pressure water distribution pipe 6, and the end is connected to the water supply booster tank. The low-pressure water distribution pipe 6 is connected to the low-pressure water tank. The water supply booster tank is connected to the high-pressure water tank through the high-pressure water distribution pipe 7. The high-pressure water tank is connected to the first The buffer tank, the low-pressure water tank is connected to the second buffer tank through the low-pres...

Embodiment 2

[0035] Example 2, such as Figure 1-3 , which is basically the same as in Embodiment 1, except that the main water supply pipe 1 is equipped with a main water supply valve 1-1 close to the water supply high-pressure tank, and the circulating water pipe 2 is equipped with a first circulation valve 2-1 and a second circulation valve 2-1. Valve 2-2, the first circulation valve 2-1 and the second circulation valve 2-2 are close to the circulating water recovery tank and the third buffer tank respectively, and a diverter valve is installed between the main water supply pipeline 1 and the circulating water pipeline 2 15-1's diversion pipeline 15, the first circulation valve 2-1 is located between the circulating water recovery tank and the diversion pipeline 15, and the diversion pipeline 15 is located between the water supply high-pressure tank and the main water supply valve 1-1.

Embodiment 3

[0036] Example 3, such as figure 1 and 2 , is basically the same as Embodiment 1 or 2, and the difference is that the urban water supply system also includes a sewage recovery tank, a main sewage pipeline 3 connected to the sewage recovery basin, an inspection well 4 arranged along the main sewage pipeline 3, a high-pressure water tank, The low-pressure water tank is connected to the fourth buffer tank through the high-pressure sewage pipeline 9 and the low-pressure sewage pipeline 10 respectively, the fourth buffer tank is connected to the main sewage pipeline 3 through the sewage distribution pipe 16, and the tail end of the main sewage pipeline 3 is connected to the tail end of the main water supply pipeline 1. The end is connected through the fifth buffer tank, the fifth buffer tank is respectively connected with the main water supply pipeline 1 and the main sewage pipeline 3 through the water supply sewage valve, the first sewage valve 3-1, and the main sewage pipeline 3 ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The present invention relates to an urban water supply system and a water supply method based on big data. The water supply system includes a water supply high-pressure tank, a main water supply pipeline, including a circulating water pipeline, and a maintenance well. The main water supply pipeline is connected with several branch water supply pipelines, which can be used The circulating water pipeline and the circulating water recovery tank keep the water in the water supply pipeline flowing, avoid long-term deposition and water quality deterioration, and use the maintenance well to monitor the water flow and water quality in real time, which is convenient for timely adjustment of the water flow and sewage treatment. The water supply of the present invention The method can deal with a variety of emergencies, and various methods can be adopted to ensure water supply.

Description

technical field [0001] The present invention relates to the technical field of water supply system design, in particular to an urban water supply system and water supply method based on big data. Background technique [0002] With the development of the motherland, more and more new towns are being built, and concepts such as smart cities and sponge cities have gradually become a reality. The water supply system is the basic guarantee for the construction of new towns. [0003] During the construction period of emerging cities, the occupancy rate is insufficient and the water utilization is insufficient. The long-term accumulation of drinking water in the water supply pipeline will cause scale deposition, which will easily cause water quality to deteriorate, and when the water quality deteriorates, it is often not found in time. [0004] In the traditional water supply system, once the main water supply pipeline is damaged, it will cause a large area of ​​water cutoff, which...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E03B1/02E03B7/02E03B7/07E03B7/09E03F1/00E03F3/02E03F5/10E03F5/02
CPCE03B1/02E03B7/02E03B7/078E03B7/09E03F1/00E03F3/02E03F5/02E03F5/10Y02A20/30
Inventor 轩春青轩志伟何献春祁永乐景红蕾
Owner 郑州商学院
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products