Method of Earthwork Migration Based on Shortest Distance First
A short-distance, earth-rock technology, which is applied in excavation, infrastructure engineering, construction, etc., can solve the problems of tedious and difficult-to-control earthwork volume
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] This embodiment introduces a method for moving earth and rocks based on the shortest distance first, including steps S1-S3.
[0031] S1. Divide the grid.
[0032] According to the engineering requirements, calculate the specific height of the ground after the leveling of the earth, that is, the zero point of the earth, and divide the grid on the existing ground. The width of the grid is selected as 20-50 meters, and the length and width of each grid are completely same. Based on the ground elevation of the intersection points of the grid grid as the basis for calculating the engineering quantity, the amount of earthwork that needs to be moved in the grid grid is roughly calculated, that is, the volume that needs to be excavated or filled. For the grid that needs to be filled, it is calculated from the nearest The soil needs to be excavated in the grid.
[0033] S2. Insert a benchmark 1 vertically at the intersection point of each grid, mark the position line of the ea...