A kind of excavation and reverse construction method for pipe curtain cover used in subway station construction

A technology for subway station, cover and dig reverse operation, applied in the field of engineering, can solve the problems of large working space, traffic congestion, low construction efficiency, etc., to achieve reliable safety guarantee and avoid inconvenience.

Active Publication Date: 2021-05-18
CHINA RAILWAY SEVENTH GRP CO LTD +1
View PDF11 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Aiming at the technical problems existing in the prior art, the present invention provides a construction method for pipe curtain cover digging and reverse construction for the construction of subway stations, so as to solve the traffic congestion caused by the open cut method in the prior art and the influence on the surrounding environment. Simply adopting the reverse method is low in construction efficiency and cannot avoid important pipelines, and the technical problems of using the pipe curtain method and the pipe jacking method require a large working space

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A kind of excavation and reverse construction method for pipe curtain cover used in subway station construction
  • A kind of excavation and reverse construction method for pipe curtain cover used in subway station construction
  • A kind of excavation and reverse construction method for pipe curtain cover used in subway station construction

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0050] as attached Figure 1-9 As shown, the present embodiment provides a construction method for pipe curtain cover excavation and reverse work for subway station construction, which specifically includes the following steps:

[0051] Step 1. Carry out traffic enclosure on the ground of the right line of the subway station; avoid the existing underground pipeline 2, carry out the construction of the groove wall reinforcement mixing pile 1 on both sides of the right line of the station, and construct the building isolation pile 3 on the right side of the right line of the station Construction, building isolation pile 3 adopts double-pipe rotary grouting pile;

[0052] Step 2. Construct the steel pipe column 4 and the pile foundation 5 on the right side of the reinforced mixing pile on the left side of the channel wall on the right line of the station. The pile foundation 5 is arranged at the lower end of the steel pipe column 4, and the column center of the steel pipe column ...

Embodiment 2

[0060] Embodiment 2 has basically the same principles and ideas as Embodiment 1, except that when the existing underground pipeline 2 is located on the right line of the station or the left line of the station is constructed first, the construction direction is opposite to that in Embodiment 1, and the construction procedure is Similar to Example 1.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a pipe screen cover excavation and reverse construction method for construction of a subway station. First, the right line or the left line of the subway station is excavated by using the cover excavation method; the right line or the left line of the subway station is covered and dug to a predetermined position Finally, the pipe curtain is jacked from the excavation line to the unexcavated line to form the shed structure; the soil under the shed structure is excavated to provide a working surface for the construction roof; after that, the construction method of cover and excavation is used to construct each floor of the station in sequence Slab girder; the present invention utilizes the supporting function of the horizontal pipe curtain structure to realize the bearing of the dead load of the soft soil of the water-rich sand layer above the horizontal pipe curtain structure and the live load of traffic and pedestrians, and at the same time, it can realize the complex underground in the overlying soil The effective avoidance of pipelines avoids the inconvenience caused by excessive occupation of the ground to pedestrian traffic.

Description

technical field [0001] The invention belongs to the technical field of engineering, and in particular relates to an excavation and reverse construction method for a pipe curtain cover used in the construction of a subway station. Background technique [0002] At present, in the construction of subway stations, the common methods include open-cut method, cover-excavation method, mine method and reverse method. There are many constraints in the construction of urban subway stations. For example, if there are important buildings on the ground, the ground settlement caused by construction must be strictly controlled. There are many existing underground pipelines that cannot be damaged, and the ground traffic is too heavy to be excessively fenced. Therefore, when choosing a construction method for the construction of a subway station, there will be many problems. For example, using the open-cut method will cause traffic congestion and affect the surrounding environment. Simply us...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E21D9/00E21D11/00E21D11/10E21D11/38E02D29/045
CPCE02D29/045E21D9/00E21D11/00E21D11/10E21D11/38
Inventor 周清才吴浩王宁赵广波肖红龙李长山杨芬芬杨学刚许海强刘宝李蒙王超范中原马红录
Owner CHINA RAILWAY SEVENTH GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products