Revit-based project progress monitoring method and system and storage medium
A technology of project progress and monitoring system, applied in the field of building information model information, can solve problems such as time-consuming and labor-intensive, inability to analyze quickly and accurately, and project timeout.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0041] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments. For the step numbers in the following embodiments, it is only set for the convenience of illustration and description, and the order between the steps is not limited in any way. The execution order of each step in the embodiments can be adapted according to the understanding of those skilled in the art sexual adjustment.
[0042] Such as figure 1 As shown, the embodiment of the present invention provides a Revit-based project progress monitoring method, comprising the following steps:
[0043] S1. Create a project schedule task through a Revit software interface; the project schedule task includes a task name and a planned start time and a planned end time corresponding to the task name.
[0044] S2. Filter out the components that have not been linked to the schedule; wherein, the components are bound to the project list.
[0045] S3...