Connecting joint of prefabricated hood pitched roof and prefabricated wall and construction method of connecting joint
A technology of prefabricating walls and connecting nodes, applied in the direction of roofs, building components, buildings, etc., can solve problems such as low efficiency and difficult construction, and achieve the effects of high safety, reduced work under the structure, and fast construction speed.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] The technical solutions of the present invention will be clearly and completely described below in conjunction with the drawings and embodiments. Apparently, the described embodiments are part of, but not all of, the embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0027] like Figure 1-2 As shown, the connection node between the prefabricated sloping roof and the prefabricated wall provided by the present invention is arranged obliquely according to the architectural design. catch.
[0028] The eaves sloping roof wall panel 2 of the present invention (referred to as the roof wall panel) is a prefabricated wall panel according to architectural design requirements, and the structure is prefabricated and maintained in a factory. The position where the eaves sloping roof w...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap