Boot-type root anchor anti-sliding pile and construction method thereof
A construction method and technology of anti-slide piles, applied in excavation, sheet pile walls, foundation structure engineering, etc., can solve the problems of manual excavation, mechanical operation, blasting, etc., to reduce construction costs, increase stability, The effect of reducing the excavation depth
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] Embodiment 1: A kind of boot-type root-anchor anti-sliding pile, such as figure 1 with figure 2 As shown, it includes a pile body 1 that is located in the landslide body and whose bottom end extends into the bedrock. The side wall of the bottom end side of the pile body 1 is excavated and poured with a pile toe 2 close to the sliding surface of the landslide body. A plurality of vertical anchor cables 5 are installed on the side of the pile body 1 away from the pile toe 2. The top ends of the vertical anchor cables 5 extend beyond the top of the pile body 1, and the bottom ends of the vertical anchor cables 5 extend into the bottom of the pile body 1. An anchor cable anchoring section 4 is formed in the borehole 3 at the end.
[0037] In the present embodiment, in the process of controlling the landslide body, the pile body 1 that is located in the landslide body and whose bottom end extends into the bedrock facilitates the use of the pile body 1 to insert the stable ...
Embodiment 2
[0050] Embodiment 2: a kind of construction method of boot-type root-anchor anti-sliding pile, such as image 3 As shown, it specifically includes the following steps:
[0051] S1. According to the conventional anti-slide pile construction procedure, the pile body hole is excavated in the sliding bed, and the wall reinforcement is made, and then the wall concrete is poured.
[0052] S2. Excavate the pile toe hole on the front side of the excavated pile hole. After the excavation enters the bedrock, use a water mill to drill the core to form a hole, and after each drilling cycle, the design requirements of the pile toe 2 will be removed. The core of the rock at the pile toe 2 position is taken, and the drill is gradually drilled to the design depth.
[0053] S3. Make vertical anchor cable 5 holes at the rear side of the pile body hole, then make and install the vertical steel cables, and grout the vertical anchor cable 5 holes.
[0054] S4. According to the design requirement...
PUM
Property | Measurement | Unit |
---|---|---|
Length | aaaaa | aaaaa |
Diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com