Visual arrangement method and device for construction task
A task configuration and task technology, applied in the computer field, can solve problems such as the inability to quickly and freely combine construction tasks, fast task definition and flexible arrangement restrictions, and affect the efficiency of continuous delivery, so as to improve continuous delivery efficiency, flexible arrangement, and applicability strong effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0067] figure 1 It is a flow chart of the method for visually arranging construction tasks provided by Embodiment 1 of the present invention. figure 2 yes figure 1 The sub-step flow chart of step 101. image 3 It is an example of the front-end interface for adding build definition information provided by Embodiment 1 of the present invention. Figure 4 It is an example of the front-end interface for selecting the corresponding build task option according to the build definition information provided by Embodiment 1 of the present invention. Figure 5 yes figure 1 The sub-step flowchart of step 102 in the middle.
[0068] Such as figure 1 As shown, the construction task visual arrangement method provided by the embodiment of the present invention includes the following steps:
[0069] 101. Generate a configuration file of a build task according to the build definition.
[0070] Preferably, as figure 2 As shown, the above step 101 includes the following sub-steps:
[0...
Embodiment 2
[0104] Figure 9 It is a schematic diagram of the construction task visual arrangement device provided by Embodiment 2 of the present invention, as shown in Figure 9 As shown, the construction task visual arrangement device provided by the embodiment of the present invention includes a configuration file generation module 21 , a construction task creation module 22 and a construction task execution module 23 .
[0105] Specifically, the configuration file generation module 21 is configured to: generate a configuration file of the construction task according to the construction definition. Preferably, the configuration file generation module 21 is configured to: add build definition information according to preset build definition rules; select corresponding build task options according to build definition information; generate build task configuration files according to preset build task configuration rules. Further preferably, add build definition information according to p...