Grouped lock waiting and scheduling method for ships in approach channel

A dispatch method and approach channel technology, applied in the directions of ship locks, ship lifting devices, instruments, etc., can solve the problem of mismatching one-way synchronous mooring methods, and achieve the effect of improving the running time

Pending Publication Date: 2020-07-17
THREE GORNAVIGATION AUTHORITY
View PDF3 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In view of the above-mentioned known problems, in order to improve the efficiency of ship lock passage for one-way synchronous mooring of ships, it is necessary to solve the problem that the navigation dispatching method before ships enter the lock, the approach channel navigation and the arrangement and scale of berth buildings are different from the one-way synchronous mooring mode of ships. To meet the problem of matching, the present invention proposes a method for ships to be locked in groups in the approach channel and operation scheduling. The approach channel in front of the lock is used to set the area to be locked in groups and its multiple berths to be locked in groups, which can be used for the same The waiting lock units composed of multiple single ships are waiting in groups, and at the same time, a matching operation scheduling method is established to meet the requirements of the one-way synchronous berthing mode of ships to the greatest extent, and reduce the impact of bad weather on the operation of the lock, thereby Improve lock operation efficiency

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Grouped lock waiting and scheduling method for ships in approach channel
  • Grouped lock waiting and scheduling method for ships in approach channel
  • Grouped lock waiting and scheduling method for ships in approach channel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0043] A method for ships waiting in groups in an approach channel and a dispatching method, which adopts the method of ships waiting in groups in the approach channel, that is, three groups of ships berthing reserve area 3, virtual formation area 2, and virtual lock area 1 are set in the approach channel The lock area and the multiple grouped waiting berths provided by the lock area are used for the grouped waiting units composed of multiple single ships at the same lock time to wait for the lock. Correspondingly, the scheduling of ships before entering the lock adopts the anchorage near the dam→the berthing reserve area→the virtual formation area→the virtual waiting area→the lock room. The operation scheduling method of three continuous actions and functions of formation and gate waiting.

[0044] The number of units waiting to be locked in groups is calculated and determined by factors such as the main channel banning time, the distance from the anchorage to the approach ch...

Embodiment 2

[0083] see figure 1 , a two-line multi-level continuous ship lock that has been built mainly adopts the one-way synchronous mooring operation scheduling method. Taking the one-way downward operation mode of one of the first-line ship locks as an example, the group waiting locks in the approach channel and their scheduling methods are discussed. The total length of the straight line section of the upper approach channel of the ship lock is 930m, including 250m of the navigation wall section, 480m of the adjustment section and 200m of the docking pier section. Ship piers with a spacing of 25m. The width of the approach channel is 180m, the width of the navigation section is 128m, and the effective length of the lock chamber is L Z It is 280m. The distance between the anchorage near the dam in the upstream and the navigation wall of the approach channel and the berth building is 7500m. According to the average statistics for many years, the time T 禁 It is 240min, and the avera...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a grouped lock waiting and scheduling method for ships in an approach channel. A ship berthing reserve area, a virtual formation area and a virtual lock waiting area which are three grouped lock waiting areas are arranged in the approach channel in front of a lock, and a plurality of grouped lock waiting berths are respectively used for lock waiting of a group lock waiting unit consisting of a plurality of single ships in the same lock. Correspondingly, according to the scheduling mode of the ships before one-way synchronous moving berthing and lock entering, a scheduling method of near-dam anchoring, a berthing reserve area, a virtual formation area, a virtual gate waiting area and a lock chamber in order is adopted, and meanwhile three continuous actions and functions of berthing, formation and lock waiting of the group of ships are sequentially completed in an approach channel.

Description

technical field [0001] The invention relates to the field of water transport and transportation, in particular to a method for ships waiting in groups in an approach channel and a dispatching method. Background technique [0002] The ship lock is a passage for ships to overcome the water level difference between the upstream and downstream of the river. It is an important part of modern transportation and plays an important role in the development of the national economy and society. In recent years, due to the strong demand for ships to pass through the locks of some hubs, the demand for passing the locks exceeds the design capacity of the locks, which has become the main "bottleneck" of the navigation of shipping hubs, resulting in the normalization trend of the backlog of ships waiting for the locks, and the social problems caused by this are becoming more and more serious. more prominent. Therefore, how to improve the passing capacity of the ship lock and relieve the pr...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02C1/00E02C1/10G06Q10/06
CPCE02C1/00E02C1/10G06Q10/0631
Inventor 齐俊麟张勇刘振嘉冉晓俊唐艳平程升鹏阮荣斌
Owner THREE GORNAVIGATION AUTHORITY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products