Method for improving hook-like crack of cold-drawn straight-slit welded pipe
A technology of straight seam welded pipe and straight seam welding, applied in the direction of metal rolling, etc., can solve the problems affecting product quality and prone to hook cracks in cold drawing of straight seam welded pipes, and achieve the goal of improving hook crack defects and organizing coordinated deformation Power-enhancing, easy-to-achieve effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0015] Embodiment 1: Take the production of SPHT3 as an example to illustrate the production method of the present invention.
[0016] (1) smelting according to conventional methods, and pouring into billets;
[0017] (2) Heat the billet in a walking heating furnace, and keep it warm for 60 minutes in a high temperature environment of 1220 ° C. After the billet is released from the furnace, it will be descaled in the descaling box and then rolled in the rough rolling mill. The rolling temperature is set to 1140 ℃, then enter the finishing rolling mill for rolling, the final rolling temperature is 870℃, the strip thickness is 6.0mm, coiled after laminar flow cooling, and the coiling temperature is set at 400℃;
[0018] (3) Straight seam welding into steel pipes, non-destructive testing after cold drawing, no hook cracks.
Embodiment 2
[0019] Embodiment 2: Take the production of SPHT3 as an example to illustrate the production method of the present invention.
[0020] (1) smelting according to conventional methods, and pouring into billets;
[0021] (2) Heat the billet in a walking heating furnace and keep it warm for 60 minutes in a high-temperature environment of 1210 ° C. After the billet is released from the furnace, it is descaled in a descaling box and then rolled in a rough rolling mill. The starting temperature is set to 1130 ℃, and then enter the finishing rolling unit for rolling, the final rolling temperature is 870℃, the strip thickness is 8.0mm, coiled after laminar flow cooling, and the coiling temperature is set at 380℃;
[0022] (3) Straight seam welding into steel pipes, non-destructive testing after cold drawing, no hook cracks.
Embodiment 3
[0023] Embodiment 3: Take the production of SPHT52.3 as an example to illustrate the production method of the present invention.
[0024] (1) smelting according to conventional methods, and pouring into billets;
[0025] (2) Heat the billet in a walking heating furnace and keep it warm for 60 minutes in a high-temperature environment of 1240 ° C. After the billet is released from the furnace, it is descaled in a descaling box and then rolled in a rough rolling mill. The starting temperature is set to 1150 ℃, and then enter the finishing rolling unit for rolling, the final rolling temperature is 870℃, the strip thickness is 8.0mm, coiled after laminar cooling, and the coiling temperature is set at 350℃;
[0026] (3) Straight seam welding into steel pipes, non-destructive testing after cold drawing, no hook cracks.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More