Construction method and secant pile construction device
A construction method and construction device technology, applied in excavation, sheet pile walls, foundation structure engineering, etc., can solve problems such as waste of materials, achieve the effects of reducing consumption rate, reducing labor input, and improving construction efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] Embodiment 1: The present invention also provides a kind of construction method that adopts above-mentioned occlusal pile construction device to carry out construction, and this construction method is used for the deep foundation pit supporting construction of sand pebble bottom narrow hole piece, comprises the following steps:
[0029] Step S1: Under the premise of satisfying the support depth requirements, the drill holes are arranged in the form of interlocking, and the drilling sequence is performed according to the drill one jump one method to form a type of hole;
[0030] Step S2: Place the positioning plate above the first type of hole, and insert the pre-embedded pile core into the first type of hole through the through hole of the positioning plate. The pre-embedded pile core is located between the concrete pile formed by the first type of hole and other concrete piles. The occlusal position, and use the pouring hole to pour concrete into the first type of hole;...
Embodiment 2
[0037] Embodiment 2: A construction method is basically the same as Embodiment 1, and the similarities will not be described again. The difference is that in step S2, the pre-embedded pile core is lifted by a crane, and the verticality is checked with a wire hammer. Make the pre-embedded pile core vertically inserted into a type of hole.
Embodiment 3
[0038] Embodiment 3: a construction method, which is basically the same as Embodiment 2, and the similarities will not be described again. In step S2, before the pre-embedded pile core is inserted into a type of hole, the pre-embedded pile core is painted to reduce friction agent.
[0039] The anti-friction agent is heated with an electric furnace until it is completely melted, and it can be painted when it feels uniform in thickness when stirred with a stirrer. The antifriction material is applied with a thickness of 1-1.5mm, and it is evenly applied to ensure the bonding quality of the antifriction material layer.
[0040] If the pre-buried pile core is coated with anti-friction agent immediately after the surface rust is removed, the surface dust must be wiped off before the subsequent coating application.
[0041] In case of rainy days, the surface of the pre-embedded pile core is wet, the surface should be wiped dry first, keep it dry and then apply the anti-friction age...