A cuttable material for reinforcing tunnel openings
A technology for cutting and reinforcing materials, which is applied in the direction of tunnels, tunnel linings, shaft equipment, etc., can solve the problems of prolonging the project period, reducing construction efficiency, and the shield machine cannot directly cut the portal, so as to speed up the construction progress and reduce the construction cost. Steps, performance easy effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
preparation example Construction
[0032] The second aspect of the present invention provides the preparation method of the cuttable material described in the first aspect, the preparation method comprising the following steps: adding modified Portland cement and polyethylene fiber into the mold, stirring for a period of time and then standing for demoulding The reinforcement material for the opening of the shield tunnel is obtained.
[0033] Preferably, the mixing method of the modified Portland cement and polyethylene fiber is as follows:
[0034] After mixing material A with polyethylene fiber, add material B for mixing.
[0035] Preferably, the stirring time is 1 to 3 minutes.
[0036] According to the third aspect of the present invention, there is provided a reinforcement material for a shield tunnel entrance. The reinforcement material for a shield tunnel entrance includes the material that can be cut in the first aspect as the excavation area material of a shield machine.
[0037] Preferably, the rein...
Embodiment 1
[0042] In this embodiment, a reinforcement material for the entrance of a shield tunnel and a construction method are provided. The structure of the reinforcement material for the entrance of a shield tunnel is as follows: figure 1 As shown, the reinforcing material is arranged in strips at the tunnel entrance for reinforcing weak soil. The reinforcing material includes three parts: I-shaped cuttable material 5, I-shaped connector 6 and I-shaped steel. The I-shaped cuttable material 5 and the I-shaped steel are connected to form a strip through the I-shaped connector 6, such as figure 1 The arrangement shown, wherein the I-shaped cuttable material constitutes the reinforced area 2 of the I-shaped cuttable material. Simultaneously, the layout of the I-beam in the common I-beam reinforcement area outside the scope of the shield machine opening is completed, and concrete is poured in the I-beam gap 4. After the concrete reaches sufficient strength, the shield machine can directl...
Embodiment 2
[0049] The cuttable material 5 prepared in Example 1 was made into a test block and the mechanical properties of the material were tested, and the style of the test block was made according to the mechanical property test specification of FRP products. The short-term strength and final strength of the tested materials are shown in Table 1.
[0050] Compressive strength Mpa Tensile strengthMpa Shear strength Mpa Bending modulus Mpa proportion 8 hours 80 90 25 20000 1.8 8 days 140 160 50 38000 1.8
[0051] It can be seen from the data in Table 1 that the strength of the modified Portland cement material provided in Example 1 still shows a trend of gradually increasing after molding, and the strength can be doubled on the eighth day. This kind of material is easy to punch and connect with I-shaped steel parts at the beginning of forming. As the placement strength gradually increases, it is applied to the tunnel opening for support, whic...
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com