Method for construction through vertical-height-continuous-gradual-change-type section tunnel secondary lining trolley
A gradual change and lining trolley technology, which is applied in the direction of tunnel lining, tunnel lining, shaft lining, etc., can solve the problems of increased construction period and project cost, non-reusable use, and more labor input, so as to reduce labor intensity and prevent water leakage Phenomenon, the effect of high degree of construction mechanization
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039] The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
[0040] refer to figure 1 and figure 2 , the embodiment of the present invention provides a vertical height continuous gradient cross-section tunnel secondary lining trolley, including a new driving beam 2, a column heightening section 3 and a side wall formwork 9; wherein, the new driving beam 2 is arranged on a standard section The lower end of the old running beam 1 of the two-lined trolley, the column heightening section 3 is arr...
PUM