Method and system for exploration and treatment of potential gushing points of karst tunnel
A water gushing point and potential technology, which is applied in the detection and treatment method and system field of potential water gushing points in karst tunnels, can solve problems such as inability to effectively detect potential water gushing points, achieve better results, ensure governance effects, and ensure operational safety.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] Attached below Figure 1-Figure 5 The present invention is described in detail, specifically, as follows:
[0038] This embodiment provides a method for detecting and treating potential water gushing points in karst tunnels, including the following steps:
[0039] (1) Detection of potential water gushing points:
[0040] Obtain the forecast data of heavy rainfall 1 in the tunnel site area in advance, and select the detection of potential water gushing points under the heavy rainfall weather of >50mm / d. The heavy rainfall 1 causes the groundwater table 2 to rise rapidly above the tunnel 3, triggering the potential water inrush point 4, and the position of each potential water influx point 4 is recorded and the orifice pipe 5 is installed in sequence. Add a flow sensor to monitor the water inflow data in real time until the heavy rainfall 1 ends and the groundwater level 2 drops back below the tunnel 3 . In this embodiment, the first heavy rainfall revealed a total of ...
Embodiment 2
[0058] This embodiment takes the Longyong Expressway Dam Tunnel in Hunan Province as the restoration object. This tunnel is a typical karst tunnel in the groundwater fluctuation zone. The tunnel is excavated in the non-rainy season, during which no water gushing occurs. After the rainy season, the heavy rain triggered potential water inflow points, and the total water inflow increased sharply to 3.6×105m 3 / d, the lining was severely damaged, and construction was postponed indefinitely.
[0059] In order to completely eliminate potential water gushing hazards and ensure project safety, a targeted grouting water blocking scheme was designed. This scheme uses the potential water gushing point detection and treatment method described in Example 1 for grouting treatment, and uses multiple heavy rainfalls to find potential water gushing points, inspect and supplement grouting, eliminating all hidden water gushing hazards. After multiple rainy season inspections in the following ye...
Embodiment 3
[0061] This embodiment provides a system for detecting and treating potential water gushing points in karst tunnels, including:
[0062] The potential water gushing point detection module obtains the detection results of potential water gushing points under heavy rainfall conditions;
[0063] The geophysical detection module obtains the geophysical detection results of water sources;
[0064] A water gushing type determination module is used to determine the water gushing type of a potential water gushing point through the analysis method of the potential water gushing point and the hydraulic connection analysis method of the water source;
[0065] The treatment scheme determination module is used to determine the treatment scheme for the water gushing type of each potential water influx point;
[0066] The effect checking module is used to check the effect of potential water influx points that have been treated and find new potential water influx points.