Subway engineering inspection pit stand column concrete construction auxiliary device and using method
An auxiliary device and inspection pit technology, which is applied in the laying of tracks, roads, tracks, etc., can solve the problems of large floor space and complex structure, and achieve the effects of improving pouring efficiency, good supporting effect and reducing waste.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0045] The present invention will be further described in detail below in conjunction with test examples and specific embodiments. However, it should not be understood that the scope of the above subject matter of the present invention is limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.
[0046] This application discloses an auxiliary device for concrete construction of a subway engineering inspection pit column 100, see figure 1 , figure 2 , image 3 , including a hopper car 1 and a hopper 2; the hopper car 1 includes a vehicle frame 12, a hopper 11 arranged on the vehicle frame 12 for storing concrete slurry and a walking assembly arranged below the vehicle frame 12; the hopper 11 The bottom surface is centered symmetrically with the running direction of the hopper 11, and at least two openings 111 that can be controlled to switch states are arranged symmetricall...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com