Foundation pit support structure and construction method thereof
A foundation pit support and construction method technology, which is applied in the direction of foundation structure engineering, excavation, sheet pile walls, etc., can solve the problems that affect the construction progress and cost, complex construction technology, non-recyclable, etc., and achieve good promotion value and construction The effect of simple process and convenient processing and production
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0041] Combine below Figure 1 to Figure 10 The structural composition of the foundation pit supporting structure of the present invention is described.
[0042] Please refer to Figure 1 to Figure 10 , a foundation pit support structure, comprising foundation pit surrounding protection piles and at least one water stop structure arranged between adjacent foundation pit protection piles, the water stop structure includes a steel plate 10, a flexible rubber water stop plate 20 and a pile head 30. There is a bending part at the top of the steel plate 10; the flexible rubber water-stop plate 20 includes a vertical plate 21 and female locks 22 provided on both sides of the flexible rubber water-stop plate. The top of the vertical plate 21 of the flexible rubber water-stop plate is embedded in the steel plate 10 Inside the bend at the top. The pile head 30 includes a triangular pyramid structure 31 with an open upper end and connecting parts 32 arranged symmetrically at both ends...
Embodiment 2
[0053] Please continue to refer Figure 1 to Figure 10 , the present invention takes bored pile 41 as an example to illustrate the construction method of this foundation pit support structure, and this construction method comprises the steps:
[0054] Step S1: positioning the retaining pile around the foundation pit and using a pile driver to complete the hole-forming construction of the bored pile 41;
[0055] Step S2: Bind the reinforcement cage, weld the C-shaped male lock 24 on the reinforcement cage, and complete the construction of the bored pile 41, and the C-shaped male lock 24 is provided with a long PC pipe with a closed bottom;
[0056] Step S3: Provide a water-stop structure, the water-stop structure includes a steel plate 10, a flexible rubber water-stop plate 20 and a pile head 30, the top of the steel plate 10 is provided with a bending portion, the flexible rubber water-stop plate 20 includes a vertical plate 21 and a The O-shaped female lock 22 provided on th...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com