Unlock instant, AI-driven research and patent intelligence for your innovation.

Method for determining reasonable roof cutting position of deep gob-side entry retaining

A definite method and roof cutting technology, applied in mining equipment, safety equipment, earthwork drilling and mining, etc., can solve problems such as roadway damage and instability, blindness, waste of manpower and material resources, etc., to improve deformation and damage, and reduce stress The effect of concentrating areas and reducing support pressure

Inactive Publication Date: 2020-09-18
鄂托克前旗长城三号矿业有限公司
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Affected by the overlying rock movement law in the upper part of the stope, there are stress-reduced areas and stress-increased areas in the surrounding rock of gob-side entry retaining. Often blindness is greater in support practice
At present, most roadways still adopt the roadside support of free fall and arbitrary roof cutting, which cannot adapt to the stability of the surrounding rock structure of the gob-side retaining roadway, resulting in frequent failure and instability of the roadway and wasting a lot of manpower and material resources

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for determining reasonable roof cutting position of deep gob-side entry retaining
  • Method for determining reasonable roof cutting position of deep gob-side entry retaining
  • Method for determining reasonable roof cutting position of deep gob-side entry retaining

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0021] The method for determining a reasonable top-cut position for a deep gob-retaining entry will be described in further detail below with reference to the accompanying drawings in the embodiments of the present invention.

[0022] like Figure 1 to Figure 3 As shown in the figure, the monitoring point 2 is arranged in the reserved roadway 4 in front of the coal mining face, and several pressure sensors 1 are arranged at a certain distance on the side of the reserved roadway 4 in the goaf, and the monitoring point 2 and the pressure sensor 1 are connected, and data collection is performed. , through the processing and analysis of the received data, the stress distribution on the side of the reserved roadway in the goaf is obtained, and the data obtained from monitoring point 2 is analyzed and compared, and the stress distribution curve of the roof near the reserved roadway 4 in the goaf is obtained. ; According to the stress distribution curve, analyze the range of stress r...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for determining a reasonable roof cutting position of a deep gob-side entry retaining. The method for determining the reasonable roof cutting position of the deep gob-side entry retaining comprises the following steps that monitoring points are arranged in a reserved roadway in front of a coal mining working face, arranging a plurality of pressure sensors on the side of the reserved roadway of a gob according to a certain distance, data is acquired to obtain a stress distribution rule of the gob close to a roof of the reserved roadway, a reasonable roof cuttingposition is determined, and anchor cables are arranged at the position, close to a reserved roadway roof, of the gob. According to the method for determining the reasonable roof cutting position of the deep gob-side entry retaining, the safety of gob-side entry retaining supporting can be improved, the overburden strata effect of the gob-side entry retaining can be exerted to the maximum extent through the synergistic effect of forming open-off cut in the stress rising area and arranging anchor cables on the gob-side of the reserved roadway, stress of a roadside supporting body is reduced, deformation and damage of surrounding rocks are effectively controlled, the cost is reduced, and safe and efficient production of coal is promoted.

Description

technical field [0001] The invention relates to the technical problem of working face mining in the field of mining engineering, in particular to a method for determining a reasonable top-cut position of a deep gob-side entry retaining. Background technique [0002] Gob-side entry retaining means that the re-support along the groove of the previous section is reserved for the next section. With the development of coal mining technology, in order to improve the coal recovery rate, most mines are now the first to use coal-free mining. , which not only eases the mining relationship, but also prolongs the life of the mine. Affected by the movement law of the overlying rock in the upper part of the stope, there are stress-reduced areas and stress-increased areas in the surrounding rock of gob-side entry retaining. Support practice is often blind. At present, most roadways still use roadside support with free fall and arbitrary roof cutting, which cannot adapt to the stability o...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21F17/00E21F17/18E21D20/00E21F15/04
CPCE21D20/00E21F15/04E21F17/00E21F17/185
Inventor 白光超张法才翟彦良向喜伟梁蓉赵业成张苍
Owner 鄂托克前旗长城三号矿业有限公司