Intelligent static pressure type pile planting construction management system and method

A construction management and static pressure technology, applied in transmission systems, signal transmission systems, closed-circuit television systems, etc., can solve problems such as high risks and management difficulties, and achieve the effect of eliminating management difficulties and improving construction quality and construction efficiency.

Inactive Publication Date: 2020-09-18
厦门艾士迪半导体有限公司
0 Cites 0 Cited by

AI-Extracted Technical Summary

Problems solved by technology

[0003] To sum up, the problems existing in the existing technology are: the existing...
View more

Abstract

The invention belongs to the technical field of management control, and discloses an intelligent static pressure type pile planting construction management system and method. A camera module is used for obtaining construction images of each equipment. A wireless sensing module is used for detecting related information and data values; a wireless transmission module is used for data transmission;acloud end is used for calculating and judging; a database is used for storing the sensing data, the construction images, the operation time of the machine equipment and related judgment standards; andan alarm module is used for notifying management personnel to process, correct or alarm in real time by using a mobile phone APP, a field display screen, a field lamp signal, a field voice player andrelated modes when the cloud calculation or judgment result is abnormal. According to the invention, various wireless transmission sensing modules and image identification systems are utilized to carry out intelligent double-signal management judgment and decision, so that the problem of difficult management of the static pressure pile planting machine can be effectively solved, and the construction quality and the construction efficiency are greatly improved.

Application Domain

Transmission systemsArtificial life +4

Technology Topic

Data transmissionData value +13

Image

  • Intelligent static pressure type pile planting construction management system and method
  • Intelligent static pressure type pile planting construction management system and method
  • Intelligent static pressure type pile planting construction management system and method

Examples

  • Experimental program(1)

Example Embodiment

[0079] Example 1:
[0080] The intelligent static pressure type pile planting construction management device provided by the embodiment of the present invention specifically includes:
[0081] 1. The pile is equipped with GPS, inclinometer, stress gauge and other wireless transmission sensing modules, which can obtain positioning, pile inclination, lifting stress and other information, and send it to the cloud for calculation.
[0082] 2. The pile handling device is equipped with GPS, inclinometer, load gauge, stress gauge, opening and closing switch, limit switch, overload detection, and other wireless transmission sensing modules to obtain positioning, body tilt, lifting load, body stress , Operation status and other information, sent to the cloud for calculation.
[0083] 3. The power self-propelled device is equipped with GPS, inclinometer, load gauge, strain gauge, fuel gauge, ammeter, voltmeter and other wireless transmission sensing modules, which can obtain positioning, body tilt, operating status, fuel volume, and operating output Information such as current and voltage is sent to the cloud for calculation.
[0084] 4. The static pressure pile planting machine is equipped with GPS, inclinometer, load gauge, stress gauge, pressed pile weight gauge, water level gauge, hydraulic pump oil pressure gauge, infrared personnel sensor gauge and other wireless transmission sensing modules to obtain positioning , The tilt of the body, the operating status, the weight of the pressed pile, the weight of the body, the oil pressure of the hydraulic pump, and the nearby personnel in operation, etc., are sent to the cloud for calculation.
[0085] 5. The self-propelled crane for piles is equipped with GPS, inclinometer, load gauge, stress gauge, on-off switch, limit switch, overload detection, and other wireless transmission sensing modules, which can obtain the positioning of various components, the tilt of the body, and the lifting Information such as lifted load, body stress, operating state, and movement of each arm is sent to the cloud for calculation.
[0086] 6. The operating personnel set up GPS, vital signs and other wireless transmission sensing modules to obtain positioning, personnel vital signs and other information, which are sent to the cloud for calculation.
[0087] 7. The cloud can search for foundation pile construction principle data by itself, foundation pile construction platform safety regulations and personnel input to establish a judgment standard database function, and use the sensing values ​​of other wireless sensing devices for calculation and judgment. The operating time of the machine and equipment can be integrated in the cloud database and used for preventive maintenance calculations. Each device is equipped with a camera, which can transmit the construction impact to the cloud. The cloud can perform calculations/judgments, and the results can be compared with the aforementioned sensing signals to achieve a dual-signal confirmation effect.
[0088] 8. The aforementioned modules can send and receive wireless signals, and can transmit information with the receiving node or each sensing wireless module.
[0089] 9. The received information signal will be sent to the cloud through wireless transmission.
[0090] The cloud system uses wireless network technology such as Zigbee, WirelessHART, ISA100.11a, Wi-Fi, Bluetooth, 3G, 4G, 5G and other methods to transmit various sensing information to the cloud system for calculation. The aforementioned data can be directly used for sensing Values ​​are directly compared/calculated/judged, and can also be integrated into the trigonometric function closed model/fuzzy/gene/annealing/genetic/particle colony/ant colony algorithm for calculation and numerical optimization.
[0091] The present invention will continue to make calculation/judgment/management decisions after sensing. If any non-compliance occurs, it will immediately use the mobile phone APP, on-site display, on-site lights, on-site sounding, etc. to immediately notify the management staff for processing/correction or Call the police.
[0092] One of the feasible calculation schemes, such as Figure 7-Figure 8 Shown.
[0093] The second feasible calculation scheme is as follows:
[0094] Such as Picture 9 As shown, if the area is S, the area calculation formula is as follows, and each point of ABCD represents each device point of the system. When each device or component is abnormally displaced, the area S will change, and such abnormal displacement means incorrect placement Or it may be caused by no display, so this system can directly compare and judge the GPS positioning points and S area changes.
[0095] Among them: 2p=a+b+c+d;
[0096] (1) Particle swarm algorithm
[0097]
[0098]
[0099]
[0100]
[0101]
[0102]
[0103]
[0104]
[0105] In the above-mentioned embodiments, it may be implemented in whole or in part by software, hardware, firmware, or any combination thereof. When the use is implemented in the form of a computer program product in whole or in part, the computer program product includes one or more computer instructions. When the computer program instructions are loaded or executed on the computer, the processes or functions according to the embodiments of the present invention are generated in whole or in part. The computer may be a general-purpose computer, a dedicated computer, a computer network, or other programmable devices. The computer instructions may be stored in a computer-readable storage medium or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions may be transmitted from a website, computer, server, or data center. Transmission to another website site, computer, server or data center via wired (such as coaxial cable, optical fiber, digital subscriber line (DSL) or wireless (such as infrared, wireless, microwave, etc.)). The computer-readable storage medium may be any available medium that can be accessed by a computer or a data storage device such as a server or data center integrated with one or more available media. The usable medium may be a magnetic medium (for example, a floppy disk, a hard disk, a magnetic tape), an optical medium (for example, a DVD), or a semiconductor medium (for example, a solid state disk Solid State Disk (SSD)).

PUM

no PUM

Description & Claims & Application Information

We can also present the details of the Description, Claims and Application information to help users get a comprehensive understanding of the technical details of the patent, such as background art, summary of invention, brief description of drawings, description of embodiments, and other original content. On the other hand, users can also determine the specific scope of protection of the technology through the list of claims; as well as understand the changes in the life cycle of the technology with the presentation of the patent timeline. Login to view more.

Similar technology patents

Connection node for adjacent prefabricated members and construction method of connection node

PendingCN110397169AImprove construction quality and construction efficiencyReduce labor costs
Owner:HUNAN YUANDA ENG DESIGN CO LTD

Power device based on air compressor unit

ActiveCN113107848AImprove stone crushing efficiencyImprove construction quality and construction efficiency
Owner:JINHUA ELECTRIC POWER DESIGN INST CO LTD +1

Emulsified asphalt paint coating device and construction method

PendingCN114517435AImprove construction quality and construction efficiency
Owner:湖南大禹神工防水科技有限公司

Impact holing super-long cast-in-situ bored pile and construction method

PendingCN113216840AReduce construction platform areaImprove construction quality and construction efficiency
Owner:ZHEJIANG COMM CONSTR GRP CO LTD +1

Constructing method for lifting open type hexahedron blocks

InactiveCN107215778AImprove construction quality and construction efficiencyprecise positioning
Owner:CCCC SHANGHAI DREDGING

Classification and recommendation of technical efficacy words

  • Improve construction quality and construction efficiency

Horizontal heavy equipment aerial mounting device and mounting method

InactiveCN106429869ASafety during installationImprove construction quality and construction efficiency
Owner:CHINA 22MCC GROUP CORP

Mounting method of hanging basket device for concrete chimney outer wall

ActiveCN110409785AEasy to install and removeImprove construction quality and construction efficiency
Owner:MCC5 GROUP CORP SHANGHAI

Movable closed solidified soil vibration-mixing equipment

PendingCN110185025AImprove mixing effectImprove construction quality and construction efficiency
Owner:BEIJING MUNICIPAL CONSTR +2

Impact holing super-long cast-in-situ bored pile and construction method

PendingCN113216840AReduce construction platform areaImprove construction quality and construction efficiency
Owner:ZHEJIANG COMM CONSTR GRP CO LTD +1

Emulsified asphalt paint coating device and construction method

PendingCN114517435AImprove construction quality and construction efficiency
Owner:湖南大禹神工防水科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products