A ventilation control system and its installation method
A technology of ventilation control system and ventilation channel, which is applied in the field of building ventilation engineering, and can solve the problems of easily occupied area and so on
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] Embodiment one, refer to figure 1 and figure 2, is a ventilation control system disclosed by the present invention, comprising a partition wall 1. When the partition wall 1 is installed, the lower part of the partition wall 1 is formed by brickwork, and the upper part of the partition wall 1 is prefabricated. In the prefabricated partition wall 1 A horizontal ventilation channel 11 is formed inside, and a vertical ventilation channel 12 is arranged on the partition wall 1 formed by brickwork, and the horizontal ventilation channels 11 of the vertical ventilation channel 12 are all located in the partition wall 1 . When installing, the upper end of the vertical ventilation duct 12 is communicated with the horizontal ventilation duct 11, and the fresh air duct 15 is connected to the horizontal ventilation duct 11, and the fresh air duct 15 is connected to the middle position of the horizontal ventilation duct 11, and the vertical ventilation duct 12 has Multiple, so tha...
Embodiment 2
[0048] Embodiment two, refer to figure 1 and figure 2 , is an installation method of a ventilation control system disclosed in the present invention. It is used to install a ventilation control system disclosed in Embodiment 1. Firstly, the partition wall 1 with the horizontal ventilation channel 11 is prefabricated, and then the partition wall 1 with the vertical ventilation channel 11 is prefabricated. Part of the partition wall 1 of the ventilation pipe is formed by brickwork. The partition wall 1 of the brickwork part and the partition wall 1 of the prefabricated part are separated from the lower side of the horizontal ventilation channel 11, and the prefabricated partition wall 1 is installed on the brickwork part. When on the partition wall 1, the air guide block 2 is installed in the horizontal air duct 11, and the wind guide plate 4 is installed in the vertical air duct 12 at the same time, and finally the fresh air duct 15 is connected to the horizontal air duct on t...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


