A method of plugging the lost formation
A plugging method and stratum technology, applied in earthwork drilling, wellbore/well parts, construction, etc., can solve problems such as stuck drill holes, affecting operation duration, affecting operation duration and cost, etc., to achieve improved pressure bearing ability, reduce the risk of re-leakage, and reduce the effect of operation risk
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0055] In order to have a clearer understanding of the technical features, objects and effects of the present invention, the specific embodiments of the present invention will now be described in detail with reference to the accompanying drawings.
[0056] refer to figure 1 , which is a schematic flowchart of a method for plugging lost formations provided by an embodiment of the present invention.
[0057] like figure 1 As shown, the method for plugging the lost formation includes: step S10, step S20, step S30, step S40, step S50 and step S60.
[0058] Step S10, bridging material to plug leakage.
[0059] Step S10 includes:
[0060] S101. Trip out the drilling tool to a safe position.
[0061] S102 , matching a bridging material with a leakage plugging mud, and lowering the drilling tool to the leakage formation.
[0062] S103 , pumping plugging mud to the lost formation and the top of the lost formation.
[0063] S104 , trip the drilling tool to the top of the leakage p...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
