The application discloses a kind of jetting post-vibration
solid guide
pipe construction methods belonging to deepwater
oil exploration technical field.The method includes the following steps: assembling guide
pipe sending tool, low pressure well head, jetting drilling tool, vibration device and guide
pipe;Jetting drilling tool sprays
drilling fluid, while guide pipe is sequentially passed through
seawater,
seabed mud line,
seabed rock layer and lowered to the depth of interest, and cuttings are generated around jetting drilling tool;Start vibration device, adjust to the optimal standing time of guide pipe and corresponding vibration frequency and vibration time, and drive guide pipe to vibrate, propagate vibration wave to surrounding soil to consolidate it, and improve the vertical
bearing capacity of guide pipe;Close vibration device, and let guide pipe stand until its vertical
bearing capacity and total floating weight of sending
system maintain
static force balance;Release sending
system, and raise jetting drilling tool, vibration device and guide pipe sending tool and recover.The application shortens the standing time of guide pipe, thereby shortens the installation time of jetting down guide pipe, and improves the installation speed.