The invention discloses a method for mounting a prestressed T-shaped girder at sea by non-rotating synchronous hoisting of double cranes. Firstly, two crawler cranes are fixed on a
deck of a square
barge, a non-rotating synchronous hoisting process is used to take and
mount the T-shaped girder, and during the hoisting and mounting process, the mounting position of the T-shaped girder is controlledonly by raising and lowering crane jibs and by adjusting the hoisting distance, so that potential construction safety hazards can be effectively reduced; secondly, two elevating-type track translational vehicles and girder storage pedestals are arranged on the
deck and used to complete the transport and storage of the T-shaped girder on the
deck; and finally, a total of four windlasses are arranged respectively at the left front, front right, back left and back right parts of the square
barge, and two winches are mounted at the positions, on one side of the square
barge, corresponding to thetwo crawler cranes, so as to achieve the stability and accurate positioning of the square barge during the process of taking and mounting the T-shaped girder. By
field practice, the method for mounting the prestressed T-shaped girder at sea by non-rotating synchronous hoisting of the double cranes is safe, achieves controllable quality, can effectively reduce the construction cost and improve theconstruction efficiency, and can be promoted for being used in similar projects.