A rapid anti-seepage consolidation grouting construction method for water-rich tunnel
A technology for consolidation grouting and water-rich tunnels, applied in tunnels, tunnel linings, earthwork drilling and mining, etc., can solve problems such as slow construction, weak support, poor water blocking and consolidation performance, and achieve the effect of ensuring construction quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0056] refer to figure 1 , a construction method for rapid anti-seepage consolidation grouting plugging of water-rich tunnels, comprising the following steps:
[0057] S100: Consolidation grouting, first pretreat the consolidation grouting area, reduce the water pressure in the grouting area, then open consolidation grouting holes, and grout and seal the holes. The mouth is smoothed; among them, the primary grouting holes 1 and the secondary grouting holes 2 are staggered with each other, and there are 55 in total, and there are 3 supporting grouting holes 3, all of which are located on the palm surface.
[0058] S200: water blocking grouting, two rings 5 are arranged on steps on the grout-stop wall 6, and 40-46 grouting holes 4 are arranged on the periphery of the two rings 5, and the holes are sealed by the full-hole grouting sealing method and the holes are smoothed.
[0059] refer to Figure 2-3 , S1 includes the following steps:
[0060] S110: Consolidation grouting ...
Embodiment 2
[0072] refer to figure 1 , a construction method for rapid anti-seepage consolidation grouting plugging of water-rich tunnels, comprising the following steps:
[0073] S100: Consolidation grouting, first pretreat the consolidation grouting area, reduce the water pressure in the grouting area, then open consolidation grouting holes, and grout and seal the holes. The mouth is smoothed; among them, the primary grouting hole 1 and the secondary grouting hole 2 are staggered with each other, and there are 55 in total, and there are 3 supporting grouting holes 3, all of which are located on the palm surface.
[0074] S200: water blocking grouting, two rings 5 are arranged on steps on the grout-stop wall 6, and 40-46 grouting holes 4 are arranged on the periphery of the two rings 5, and the holes are sealed by the full-hole grouting sealing method and the holes are smoothed.
[0075] refer to Figure 7 , S1 includes the following steps:
[0076] S110: Consolidation grouting pret...
Embodiment 3
[0091] refer tofigure 1 , a construction method for rapid anti-seepage consolidation grouting plugging of water-rich tunnels, comprising the following steps:
[0092] S100: Consolidation grouting, first pretreat the consolidation grouting area, reduce the water pressure in the grouting area, then open consolidation grouting holes, and grout and seal the holes. The mouth is smoothed; among them, the primary grouting holes 1 and the secondary grouting holes 2 are staggered with each other, and there are 55 in total, and there are 3 supporting grouting holes 3, all of which are located on the palm surface.
[0093] S200: water blocking grouting, two rings 5 are arranged on steps on the grout-stop wall 6, and 40-46 grouting holes 4 are arranged on the periphery of the two rings 5, and the holes are sealed by the full-hole grouting sealing method and the holes are smoothed.
[0094] refer to Figure 8 , S1 includes the following steps:
[0095] S110: Consolidation grouting pret...