Road greening transformation construction method
A construction method and road technology, applied in planting methods, botanical equipment and methods, flower pot filling, etc., can solve the problems of backward construction methods and low efficiency, and achieve the effect of convenient operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] The specific embodiment of the present invention will be described in further detail by describing the embodiments below with reference to the accompanying drawings, the purpose is to help those skilled in the art to have a more complete, accurate and in-depth understanding of the concept and technical solutions of the present invention, and contribute to its implementation.
[0031] This embodiment provides a construction method for road greening reconstruction. This construction method has the characteristics of high efficiency and convenient operation, and can quickly complete the greening construction reconstruction in the road construction area.
[0032] Such as Figure 1 to Figure 11 As shown, this road greening reconstruction construction method uses an automatic digging planter for reconstruction construction, including the following steps:
[0033] Digging: The automatic digging planter includes a body 11, a driver is arranged inside the body 11, the driver is...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com