Construction pipe pile interception construction system and process
A technology for building construction and pipe piles, which is applied in the field of construction system and construction technology for pipe pile cutting in construction, can solve the problem that the concrete residue cannot be prevented from falling into the inside of the pipe pile, the concrete and steel reinforcement of the pipe pile cannot be classified and processed, and the elevation measurement data is inconsistent. Accuracy etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] The embodiments of the present invention will be described in detail below with reference to the accompanying drawings, but the present invention can be implemented in many different ways defined and covered by the claims.
[0029] like Figure 1 to Figure 7 As shown, a building construction pipe pile cutting construction system includes a mobile device 1, a chiseling device 2 and a cutting device 3, a chisel device 2 is installed in the middle of the mobile device 1, and a cutting device 2 is arranged above the chisel The device 3, the cutting device 3 is installed above the middle part of the mobile device 1.
[0030] The mobile device 1 includes a support plate 11, a sliding wheel 12, a circular hole 13, a moving handle 14, a disk plate 15 and a support column 16, and the support plate 11 is a U-shaped structure with an opening downward, and the support plate 11 The four corners of the lower end surface are all provided with sliding wheels 12 for moving, the middle ...