Unlock instant, AI-driven research and patent intelligence for your innovation.

Column foot construction method of raw bamboo bunched building

A construction method and clustering technology, applied in the processing of building materials, construction, building structure and other directions, can solve the problems of the height of bamboo buildings cannot be guaranteed, the stability of bamboo buildings is affected, the stability is not good enough, etc. Firm, good connection stability, good support effect

Active Publication Date: 2020-11-03
重庆大学建筑规划设计研究总院有限公司 +4
View PDF8 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Because the existing bamboo building materials use the main body as the load-bearing column, the installation of the lower part of the load-bearing column is usually directly inserted deep underground. Although this can solve the problem of low strength and insufficient stability to a certain extent, bamboo A large part of the bamboo will extend into the ground, and the height of the bamboo building cannot be guaranteed; moreover, when the external environment changes (such as heavy rain, etc.), it will have a great impact on the stability of the bamboo building, and the danger High and inconvenient to maintain

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Column foot construction method of raw bamboo bunched building
  • Column foot construction method of raw bamboo bunched building
  • Column foot construction method of raw bamboo bunched building

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0027] The present invention will be further described in detail below with reference to the accompanying drawings.

[0028] During specific implementation: Figure 1 to Figure 4 As shown, a method for the construction of the column foot of the original bamboo cluster building includes the following steps:

[0029] a) Build a side formwork on the ground according to the designed shape of the concrete base 7 to form a concrete base cavity, and then install a steel cage or a steel frame in the cavity.

[0030] b) Prepare a mounting connector, which includes a (metal) mounting plate 1 arranged horizontally. A number of connecting ribs 2 distributed in an array are vertically arranged on the lower side of the mounting board 1, and a number of embedded steel sheets 3 distributed in an array are vertically arranged on the upper side of the mounting board 1. In the implementation process, the spacing between the embedded steel sheets 3 is designed and arranged according to the diameter of...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a column foot construction method of a raw bamboo bunched building. The column foot construction method comprises the following steps of a, building side formworks; b) preparing a mounting connecting piece, wherein the mounting connecting piece comprises a mounting plate, a connecting rib is mounted at the lower side of the mounting plate, an embedded steel sheet is mountedat the upper side of the mounting plate, and each embedded steel sheet is provided with a prefabricated hole; c) putting the mounting connecting piece into a cavity, and then pouring concrete; and d)processing a raw bamboo bunched column, and forming a through hole in the lower end of the raw bamboo bunched column, wherein the raw bamboo bunched column is sleeved with the embedded steel sheet atthe upper side of the mounting connecting piece; e) processing a steel clamping plate, wherein a via hole is formed in the steel clamping plate, and the steel clamping plate is arranged between everytwo adjacent rows of raw bamboo; and f), using multiple opposite-pulling screw rods to fixedly connect the embedded steel sheets, the steel clamping plate and the raw bamboo together. According to the method, the hollow raw bamboo is supported and fixed through positioning steel sheets, the hollow raw bamboo is filled with concrete, the stability of a bamboo structure base can be improved, and implementation is easy.

Description

Technical field [0001] The invention belongs to the technical field of construction of raw bamboo buildings, and particularly relates to a construction method for the column base of a cluster building of raw bamboo. Background technique [0002] The bamboo building structure has developed from traditional bamboo and wood lap, winding, tenon and tenon jointing, etc., to a hybrid structure type combining bamboo structure with steel structure, reinforced concrete structure, membrane structure, and masonry structure. The bamboo material is crushed and glued, and its physical properties are improved and strengthened to become a new type of bamboo laminated material, which can be calculated according to the calculation method of modern building structure. The participation of bamboo materials in the modern architectural structure system can enable bamboo materials that could only be built for small buildings to be applied to large-space buildings, multi-story and even high-rise buildin...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E04G21/00E04C3/36
CPCE04G21/00E04C3/36
Inventor 聂诗东李静尧钟树生苟基佐江舟陈静程睿王军龙魏奇科廖袖锋王维说江璐
Owner 重庆大学建筑规划设计研究总院有限公司