A construction method and post-pouring belt technology, which are applied in artificial islands, water conservancy projects, infrastructure projects, etc., can solve problems such as affecting the quality of concrete pouring, consuming a lot of manpower and material resources to clean the post-pouring belt, and concrete outflow.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0018] Example figure 1 , figure 2 and image 3 As shown, the construction method of the reinforced raft slab of the present invention with a grout retaining strip after pouring comprises the following steps:
[0019] Step 1. After the pouring of the concrete cushion layer 2 of the post-pouring belt 1 is completed, the waterproof membrane is used for the construction of the waterproof layer 3;
[0020] Step 2: The formwork is supported on the waterproof layer 3, and the two first wooden squares 4 are fixedly arranged on both sides of the concrete cushion layer 2 of the post-pouring belt, and the two second wooden squares 5 are arranged in the post-casting belt 1 and connected with the first The wooden squares 4 are arranged in parallel, and the adjacent first wooden square 4 and the second wooden square 5 are arranged at intervals;
[0021] Step 3. The two third wooden squares 6 are arranged at intervals in the post-casting belt 1 and between the two second wooden squares ...
PUM
Login to View More Abstract
Description
Claims