Deep foundation pit piping treatment method
A treatment method and technology for deep foundation pits, which are used in excavation, soil protection, infrastructure engineering, etc., can solve the problems of troublesome piping treatment, delayed construction period, difficult piping treatment, etc., so as to reduce the possibility of piping and excavation. easy effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0060] The embodiment of the present application discloses a method for treating plumbing in a deep foundation pit, which includes the following steps: S10, marking the foundation pit; S20, installing a protective component; S30, draining the foundation; S40, compacting; S50, excavating the foundation pit.
[0061] refer to figure 1 , S10, the specific way of marking the foundation pit is: draw a closed inner perimeter line along the wall position of the pre-excavated foundation pit, draw a closed outer perimeter line outside the inner perimeter line, and the outer perimeter line surrounds the inner perimeter line. The outline shape of the outer perimeter line coincides with the outline shape of the inner perimeter line and the center of the outer perimeter line coincides with the center of the inner perimeter line. The area within the inner perimeter line is the foundation pit area 11, the area outside the inner perimeter line and within the outer perimeter line is the treatm...
Embodiment 2
[0069] The difference from Embodiment 1 is that step S31 is performed while step S30 is performed, and the foundation is pumped. After S20 ends, S30 and S31 are performed simultaneously, and S40 is performed after the end of S31 at the same time. refer to Figure 6 and Figure 7 , S31, the specific method of ground pumping is: install a pumping assembly 5 in the outer area 13, use the pumping assembly 5 to pump water to the outer area 13, and then remove the pumping assembly 5. The pumping assembly 5 includes a pumping pipe 51 and a vacuum pump 52. The bottom of the pumping pipe 51 is closed, and the bottom of the pumping pipe 51 is fixedly provided with a second sinking portion. The second sinking portion is in an inverted conical shape so that the pumping pipe 51 sinks into the foundation. It has a higher sinking efficiency. A plurality of water-absorbing holes 511 are provided on the side of the suction pipe 51 . S31, the specific implementation of foundation pumping in...