Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

53results about How to "Reduce the possibility of collapse" patented technology

Large depth underground continuous wall water-stop joint device

The invention relates to a water sealing joint device of a large-depth underground continuous wall. The water sealing joint device consists of a water sealing connector plate and a rubber water stop; the water sealing connector plate comprises connector side plates connected in sequence, two arc shape plates, an H-shaped groove plate, an upper end plate and a lower end plate; the two arc shape plates are oppositely arranged in the middle at intervals along the width of a connector side plate, and the H-shaped groove plate is arranged in the middle between the two arc shape plates; the H-shaped groove plate has two opening ends, one end is fixed and connected with the two arc shape plates, and the other end is fixed and connected with the connector side plate; and the upper end plate and the lower end plate are arranged at the end parts of the two arc shape plates and the H-shaped groove plate. An opening slot is arranged at the middle part of the upper end plate and the lower end plate, and the rubber water stop is embedded in a gap between the opening slot and the opening end of the H-shaped groove plate. The connector side plate adopts a long strip shape thick steel plate, the upper end plate and the lower end plate adopt semi-circular steel plates, and the composite cross section of the two arc shape plates is matched with the shape of the upper end plate and the lower end plate. The depth of the opening slot of the upper end plate and the lower end plate is approximately identical to half of the width of the rubber water stop. The invention can improve the prior construction process, reduce the construction cost, and effectively improve the water sealing performance of the structure of the underground continuous wall.
Owner:SHANGHAI URBAN CONSTRUCTION MUNICIPAL ENGINEERING (GROUP) CO LTD

Wall building mechanical equipment with good using effect based on Internet of Things

InactiveCN108277991AHit evenlyAdhesive fasteningBuilding material handlingBrickThe Internet
The invention relates to wall building mechanical equipment with good using effect based on the Internet of Things. The wall building mechanical equipment comprises a base, stand columns, a lifting platform, clamping jaws, a material placing platform, a compaction mechanism and a material plastering mechanism. The compaction mechanism comprises a reciprocating component and a knocking component, and the material plastering mechanism comprises a material plastering component and a recycling component. According to the wall building mechanical equipment with the good using effect based on the Internet of Things, bricks can be knocked comprehensively and uniformly through the compaction mechanism, so that the upper and lower layers of bricks and cement between the bricks contact with each other fully, and compared with an existing automatic wall building machine, the bricks are bonded more tightly, so that the possibility of collapse caused by loose bricks is reduced; and the consumptionof cement resources is saved through the material plastering mechanism, the influence of external environmental factors on cement solidification is avoided, recycled cement is reused, compared with the existing automatic wall building machine, waste of the cement resources is avoided, the construction cost is reduced, and the practicability and reliability of the automatic wall building machine are improved.
Owner:南安市智德机械设备有限公司

Real-time surveying and mapping device and method based on foundation pit deformation monitoring

The invention relates to the technical field of foundation pit deformation monitoring, and discloses a real-time surveying and mapping device and method based on foundation pit deformation monitoring. The real-time surveying and mapping device comprises a base and a monitoring mechanism disposed on the base. The monitoring mechanism comprises a vertical plate arranged on the base and a plurality of monitoring rod slidably arranged on the vertical plate; the monitoring rods are horizontally arranged along one side of the vertical plate in an array mode; contacts are arranged on the monitoring rods; adjusting nuts are arranged on the monitoring rods; adjusting springs sleeve the monitoring rods; and the adjusting springs are located between the vertical plate and the adjusting nuts. The real-time surveying and mapping device based on foundation pit deformation monitoring has the effect of improving the foundation pit deformation monitoring capacity.
Owner:山东志诚地理信息技术有限公司

Sodium-ion battery positive electrode material with multi-core type core-shell structure and preparation method of sodium-ion battery positive electrode material

The invention relates to a sodium ion battery positive electrode material with a multi-core type core-shell structure and a preparation method thereof, the sodium ion battery positive electrode material with the multi-core type core-shell structure comprises a plurality of particles, and each particle comprises a core and a shell wrapping the outer side of the core. The core is composed of a plurality of inner cores, and a gap exists between any two adjacent inner cores in the plurality of inner cores. The plurality of inner cores are made of two or more than two nanoscale particle materials with the same or different structures. The nanoscale particle material is one or more of a layered structure material, a tunnel structure material, a polyanion compound and a large-frame compound material. According to the sodium ion battery positive electrode material, advantages of the structure and the performance can be complemented on the nanoscale level, defects can be made up, and the due advantages of the sodium ion battery positive electrode material can be better exerted compared with simple mixed use and smearing of the sodium ion battery positive electrode material on a pole piece. The invention also provides a preparation method of the sodium ion battery positive electrode material.
Owner:ZHEJIANG MEIDARUI NEW MATERIAL TECH CO LTD

Multistage series-connection gasifier chamber structure

The invention relates to entrained flow gasifier technology, and particularly discloses a multistage series-connection gasifier chamber structure which comprises a first-stage chamber, a second-stage chamber and a third-stage chamber which are sequentially connected in the longitudinal direction, wherein the first-stage chamber, second-stage chamber and third-stage chamber are respectively a hollow cylinder and are connected through a hollow cone. By organizing the gasifier chambers in a multistage series-connection structure, the reaction regions in the chambers are distributed in a more reasonable way, thereby prolonging the retention time of coal powder particles in the reaction regions, increasing the carbon conversion rate, reducing the volume of the upper mixing region and pyrolysis region, reinforcing the mass transfer, reducing the high-temperature backflow region and lowering the possibility of vault slump.
Owner:中国东方电气集团有限公司

Super high-rise building deep foundation pit and construction method thereof

The invention discloses a super high-rise building deep foundation pit and a construction method thereof, relates to a foundation pit and aims to solve the technical problem in the prior art that water is prone to permeating into the foundation pit. The super high-rise building deep foundation pit and the construction method thereof are characterized in that the super high-rise building deep foundation pit comprises a pit body arranged in a soil body and a plurality of continuous walls arranged at the outer edge of the pit body in a surrounding manner, a plurality of supporting protecting piles arranged on the sides, close to the pit body, of the continuous walls and supporting components for supporting the supporting protecting piles, wherein the pit body is internally provided with vertical column components for fixing the supporting components, and the multiple supporting protecting piles are arranged in the circumferential directions of the continuous walls; when construction is performed, the continuous walls are cast and the supporting protecting piles are hit in, then the pit body is excavated, then the vertical column components and the supporting components are fabricated,so that the supporting protecting piles are supported, and the possibility of foundation pit collapse can be reduced; and by means of two-layer protection of the continuous walls and the supporting protecting piles, groundwater permeating into the foundation pit from positions between the continuous walls and the positions between the supporting protecting piles can be reduced, and reduction of construction influence of the permeating water on the foundation pit is facilitated.
Owner:汪龙杰

Steel structure building based on steel structure building and having collapse protection function

The invention discloses a steel structure building based on a steel structure building and having a collapse protection function, and relates to the technical field of steel structure buildings. In order to solve the problem that a collapse protection structure is rapidly crushed due to the fact that the quantity of collapsed and fallen building materials is increased, the steel structure building specifically comprises a supporting part which is arranged in a stratum through a plurality of base supporting structures, and the supporting part comprises a plurality of supporting assemblies, a plurality of trusses, a plurality of connecting steel columns and at least two connecting columns; and mixed wallboards are arranged on the outer walls of the multiple connecting steel columns, one side of each mixed wallboard is fit in with one side of the corresponding supporting assembly or one side of the corresponding connecting column correspondingly, and a lifting groove is formed in the outer wall of one side of each of every two mixed wallboards at the opposite positions. According to the steel structure building, the building materials slide to the mixed wallboards along a back shore base, a material conveying opening is pushed to be automatically opened, the building materials fall down along the wall face, people or objects are prevented from being accidentally injured when the building materials fall down, the bearing capacity of the back shore base is relieved, the anti-collapse protection time of the steel structure building is prolonged, and personnel and property losses are reduced.
Owner:詹玉琼

Municipal soft foundation road reinforcing method

The invention relates to the technical field of soft foundation road reinforcement, in particular to a municipal soft foundation road reinforcing method. The method comprises the steps that a field isleveled, and pile positions are determined; each pile position is downwardly drilled by one unit depth by taking the ground as a reference surface, and a soil body is removed to form a pile hole; thelower part of the hole wall of each pile hole is extruded and expanded in the circumferential direction to form a branch cavity; pile casings are lowered into the pile holes, the bottom ends of the pile casings abut against the bottom faces of the pile holes, grouting is conducted in gaps between the pile casings and the hole walls of the pile holes till gaps between the branch cavities and the pile holes and the gaps between the pile casings and the hole walls of the pile holes are filled with grout, and branch piles are formed after the grout is solidified; drilling is further performed bytaking the bottom surfaces of the pile holes as a reference surface, and the aforesaid steps are repeated until the pile holes are machined to a required depth; and grout is poured into all sections of the pile casings and the grout is solidified, where in the vertical direction, the outer diameter of a pile casing on a lower layer is smaller than or equal to the inner diameter of a pile casing onan upper layer, and the heights of all sections of the pile casings are equal. The reinforcing method has the effect that the branch pile forming quality is high.
Owner:宁波汇洲生态建设有限公司

Foundation pit supporting structure and construction method thereof

The invention discloses a foundation pit supporting structure and a construction method thereof. The foundation pit supporting structure comprises a plurality of baffles arranged on the inner side wall of a foundation pit, wherein all the baffles are sequentially arranged in the circumferential direction of the foundation pit, and a plurality of connecting rods are connected between each baffle and the inner side wall of the foundation pit; a connecting hole penetrates the position, located on each connecting rod, of each baffle in the thickness direction of the baffle, a mounting hole is formed in the position, located on each connecting hole, of the foundation pit, and one end of each connecting rod is inserted into the corresponding mounting hole through the corresponding connecting hole; an abutting rod used for abutting against the inner side wall of each mounting hole is rotationally arranged at the end, located in the mounting hole, of the corresponding connecting rod, and a driving assembly used for driving each abutting rod to rotate is arranged between the abutting rod and the corresponding connecting rod; and an abutting block abutting against the side, away from the corresponding mounting hole, of each baffle is arranged at the end, away from the corresponding abutting rod, of each connecting rod. After construction in the foundation pit is completed, constructors disassemble the connecting rods, and then the baffles can be disassembled, so that the baffles can be repeatedly used, and the construction cost can be reduced.
Owner:韶关市鹏成建筑工程有限公司

Drilling-and-backfilling type circular mould drilling equipment

The invention relates to the field of circular mould drilling equipment, in particular to drilling-and-backfilling type circular mould drilling equipment. The equipment comprises two semicircular clamping rings which are detachably connected, a circular mould is clamped between the two clamping rings, the clamping rings are placed on a circular mould roller carrier, a plurality of containing holes are formed in the outer side walls of the clamping rings, filling assemblies are arranged in the containing holes, the filling assemblies correspond to material holes in the circular mold one to one, each filling assembly comprises an electromagnet arranged at the opening end of the corresponding containing hole, the electromagnets are electrically connected to a control system, a magnetic block used for repelling the electromagnet is arranged in each containing hole in a sliding manner, a reset compression spring is further shored between each magnetic block and the closed end of the corresponding containing hole, and an air guide pipe is arranged on each magnetic block; and the air guide pipes penetrate through the inner walls of the clamping rings in a sliding manner and are provided with sleeve bases, the sleeve bases are sleeved with balloons, one ends of the air guide pipes are communicated with the corresponding containing holes, and the other ends of the air guide pipes are communicated with the corresponding balloons. The equipment has the advantage that the possibility that workers need to clean drilling cuttings in feeding holes of the circular mould subsequently is reduced.
Owner:常州朱美拉模具技术有限公司

Coal mine underground complex stratum directional drilling pressure control drilling system

The invention discloses a coal mine underground complex stratum directional drilling pressure control drilling system. The system involves a drill rod, a sealing pipe, a water release bin, a liquid outlet pressure control assembly and a liquid inlet pressure control assembly, wherein the drill rod stretches into a drill hole, an annulus is formed between the drill rod and the drill hole, the sealing pipe is fixedly embedded into an inlet of the drill hole so that mixed liquid in the annulus can flow to outside through the sealing pipe, the sealing pipe is connected with the water release bin through a flange, the bottom of the water release bin is connected with the liquid outlet pressure control assembly, and the liquid outlet pressure control assembly can adjust the plugging area of a liquid outlet so that the liquid outlet pressure of the mixed liquid in the annulus can be controlled. According to the system, the end, away from the drill hole, of the drill rod sequentially penetrates through the sealing pipe and the water release bin so as to enable a center hole in the drill rod to be connected with a faucet, the other end of the faucet is connected with the liquid inlet pressure control assembly, and the liquid inlet pressure control assembly can conduct pressurization pressure control in a pulse mode while continuously feeding liquid to the center hole in the drill rod, so that the bidirectional pressure control is realized.
Owner:HENAN POLYTECHNIC UNIV

Rural cement highway roadbed reinforcing structure

The invention relates to the field of road construction, and in particular relates to a rural cement highway roadbed reinforcing structure which comprises a cushion layer, a base layer and a pavementlayer which are sequentially laid from bottom to top. Reinforcing devices are arranged on the two sides of the base layer; each reinforcing device comprises a vertically-arranged supporting column with the lower end fixed into the cushion layer; the multiple supporting columns are arranged in the length direction of the base layer at intervals; reinforcement cages are arranged on the sides, away from the base layer, of the supporting columns; the section of each reinforcement cage is in a right triangle shape, the inclined face of each reinforcement cage is back to the base layer, and the twosides of each reinforcement cage abut against the opposite sides of every two adjacent supporting columns correspondingly; stones are filled in the reinforcement cages; concrete layers are paved on the inclined faces of the reinforcement cages; and a drainage ditch is arranged on the cushion layer and located on the side, away from the base layer, of each reinforcement cage. The reinforcing structure has the effect of improving the stability of a roadbed structure.
Owner:安徽鼎顺建筑工程有限公司

Non-motor vehicle road surface mechanism

ActiveCN108179668AThere will be no phenomenon of different degrees of subsidenceReduce unevennessRoadwaysEngineeringRoad surface
The invention relates to the technical field of municipal construction and discloses a non-motor vehicle road surface mechanism. The non-motor vehicle road surface mechanism comprises a basic soil layer, a traveling section, a green section, a power ditch, a connecting block and cover boards. Multiple curbs used for corresponding to the multiple cover boards are arranged on the two sides of the traveling section. Installation blocks are arranged on the side walls of the sides, close to each other, of the curbs on the two sides. The two ends of each cover board abut against the upper surfaces of the corresponding installation blocks on the two sides. A connecting piece used for connecting two adjacent curbs is arranged between the two adjacent curbs located on the same side. Only one coverboard is arranged in the direction perpendicular to the extending direction of the traveling section, so that the phenomenon that the settlement degrees of the cover boards in the direction perpendicular to the extending direction of the traveling section are different is avoided; and each connecting piece is used for limiting the two adjacent curbs, at the moment, the two adjacent cover boards simultaneously settle at the same degree, and finally the possibility that a road surface is uneven can be reduced.
Owner:成都市市政工程设计研究院有限公司

Supporting device with protection function for coal mine safety construction

The invention discloses a supporting device with a protection function for coal mine safety construction. The supporting device with the protection function comprises a base, a first supporting columnis connected to the base, a second supporting column is arranged on the first supporting column, the first supporting column and the second supporting column are sleeved with sleeves, a top plate isconnected to the end, away from the first supporting column, of the second supporting column, and an upper baffle is arranged in the top plate; and the end, located outside the top plate, of the upperbaffle is connected with a handle, the end, away from the handle, of the top plate is connected with a side baffle, an extension plate is arranged in the side baffle, and cavities are formed in the sleeves and located between the first supporting column and the second supporting column. According to the supporting device, through arrangement of corresponding mechanisms on the coal mine supportingdevice, the supporting device can effectively block soil or stones in a mine during use, the situation that the soil or the stones in the mine fall off to injure workers is effectively reduced, the safety coefficient in the mine is effectively improved, and the possibility of mine collapse caused by falling of a large amount of soil or stones is effectively reduced.
Owner:HEILONGJIANG UNIV OF TECH

Method for reinforcing water-rich silt strata by obliquely arranging multiple rows of freezing pipes

The invention discloses a method for reinforcing water-rich silt strata by obliquely arranging multiple rows of freezing pipes. The method comprises the following steps of 1, conducting surveying andsetting out; 2, conducting drilling with casing; 3, obliquely arranging the multiple rows of freezing pipes; and 4, reinforcing the water-rich silt strata. According to the method, before excavation,silt soil layers on the two sides of a groove wall to be subjected to excavation are obliquely frozen and reinforced to form oblique reinforced pile walls, the distance between the upper portions of the reinforced pile walls is wide, and the distance between the lower portions of the reinforced pile walls is narrow; the side wall of the groove wall to be subjected to excavation can be reinforced,the bottom can be effectively frozen and reinforced, so that the enough strength is achieved, engineering accidents such as water gushing are prevented, and the groove wall collapse possibility in theexcavation process of an underground diaphragm wall can be effectively reduced; and the method is suitable for excavation of silt sand inclusion layers and high underground water levels, it is guaranteed that follow-up excavation construction is safely, reliably and smoothly carried out, the practicability is high, and the effect of reducing pollution can also be achieved.
Owner:NO 1 ENG LIMITED OF CR20G

A fine-tuning anchor and method capable of compensating for prestress loss in water-rich sand layers

The invention discloses a fine-tuning anchorage and method capable of compensating for the loss of prestress in a water-rich sand layer, including a base plate, a control cabinet, a frame, a connecting plate and a third connecting rod. The top of the hydraulic cylinder is movably mounted with a multi-stage hydraulic rod, the top of the multi-stage hydraulic rod is rotationally connected to one end of the third connecting rod through the second rotating shaft, and the other end of the third connecting rod is connected to the bottom of the frame through the second rotating shaft. The shaft seat fixed on one side of the end is rotatably connected, a lead screw is fixed in the middle of the groove on the upper surface of the frame, a stepping motor is fixed on the upper surface of the frame at one end of the lead screw, and the stepping motor and the lead screw in the lead screw The rod is connected by rotation, the middle of the lower surface of the connecting plate is movably connected with the lead screw, the upper surface of the connecting plate is fixed with a motor, and one end of the motor is rotated and installed with an anchor through a transmission shaft. The invention has the advantages of adjusting the angle of the anchorage all the time during the construction to adapt to the prestress and reducing the possibility of soil layer collapse.
Owner:SUBWAY ENG CO LTD OF CHINA RAILWAY 16TH CONSTR BUREAU

Method for determining stage difference of horizontal directional reaming

The present invention relates to a method for determining a stage difference of horizontal directional reaming. According to the method, a plastic zone scope generated by a preceding stage of counterboring is used as a to-be-cut scope of a next stage of counterboring, i.e. a plastic zone thickness of a preceding stage is used as a cutting amount of a next stage of counterboring, i.e. a stage difference of counterboring. The method specifically comprises the following steps: (1) determining a final hole diameter; (2) determining stress distribution of an elastic zone after an (i)th stage of counterboring; (3) based on Mohr-Coulomb criteria, determining stress distribution of a plastic zone after the (i)th stage of counterboring; (4) determining a radius of the plastic zone after the (i)th stage of counterboring; (5) determining a plastic zone thickness after the (i)th stage of counterboring; (6) determining a stage difference of an (i+1)th stage of counterboring; (7) determining a radius of an (i+1)th stage of hole; and (8) comparing a diameter of the (i+1)th stage of hole with the final hole diameter, and if the diameters are close, terminating the calculation process, and determining the number of stages of counterboring. According to the method provided by the present invention, when carrying out a next stage of counterboring, a plastic zone generated by a preceding stage of counterboring is cut off, so as to prevent hole collapse caused by secondary loading of a plastic zone, and reduce possibility of hole collapse.
Owner:SOUTHWEST PETROLEUM UNIV

Concrete compression test real-time supervision system

The invention relates to a concrete compression test real-time supervision system, which comprises a bracket, a mounting plate and a camera, wherein the mounting plate is provided with a protection device, the protection device comprises a transparent cover, and the mounting plate is provided with a fixing mechanism; the fixing mechanism comprises two horizontal blocks which are vertically and fixedly connected to one side of the mounting plate; vertical blocks are fixedly connected to the opposite inner sides of the two horizontal blocks respectively; a slot is formed between each vertical block and the mounting plate; two first inserting blocks are fixedly connected to the outer side wall of the transparent cover; the two first inserting blocks are respectively inserted into the two inserting grooves; each first inserting block is provided with an inserting hole, two through holes are formed in the mounting plate, a rack is slidably connected into each through hole in the width direction of the mounting plate, the two racks can be inserted into the two inserting holes respectively, and a transmission assembly used for driving the two racks to move is mounted on the side, away from the corresponding first inserting block, of the mounting plate. By arranging the protection device, the camera can be conveniently protected, so that the possibility that the camera is broken by disintegrating slag can be reduced.
Owner:合肥工大建设监理有限责任公司

Water seepage source diagnosis and flow guide device for foundation pit without waterproof curtain

The invention belongs to the technical field of foundation pit construction, and particularly relates to a water seepage source diagnosis and flow guide device for a foundation pit without a waterproof curtain. The device comprises a flow guide mechanism and a detection mechanism, wherein the flow guide mechanism comprises a flow guide pipe; a pipe body of the flow guide pipe is divided into a negative pressure section and a seepage section from top to bottom; a plurality of seepage holes are formed in the pipe wall of the seepage section; the pipe body of the seepage section of the flow guide pipe is filled with a filter material; the detection mechanism comprises a plurality of sensors buried in the filter material; the sensors are arranged in the filter material from top to bottom; the output ends of the sensors are in signal connection with the input end of an external signal acquisition instrument through wires; and the output end of the signal acquisition instrument is in wireless signal connection with the input end of a cloud platform server. The water seepage source diagnosis and flow guide device can effectively detect the position of a water seepage source of the foundation pit without the waterproof curtain, and improves the safety performance of the foundation pit.
Owner:HENAN UNIVERSITY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products