A U-turning Method of Double Guide Girder Bridge Erecting Machine
A bridge erecting machine and guide beam technology, which is applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve problems such as time-consuming re-acquisition, large site requirements, complicated operations, etc., to eliminate safety hazards in hoisting and installation, The effect of short time consumption and simple steps
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0067] The steps of the U-turn method of the double guide girder bridge erecting machine include:
[0068] Step 1: After erecting the 40m beam slab, install the auxiliary middle outrigger 3 between the front outrigger 2 and the middle outrigger 4, and prepare to turn around;
[0069] Step 2: Remove the bolts below the 1m heightened section of the middle outrigger 4, jack up the front outrigger 2, auxiliary middle outrigger 3, and rear outrigger 5, and raise the main beam 1 by 50cm;
[0070] Step 3: Add a 44cm heightening joint to the middle outrigger 4, and move forward to a position about 3,30m away from the auxiliary middle outrigger to support the force;
[0071] Step 4: The rear outrigger 5 moves forward to a position close to the middle outrigger 4,5m to support the force;
[0072] Step 5, the front crane 7 is moved to the top of the front outrigger 2, and the rear crane 8 is moved to the top between the middle outrigger 4 and the rear outrigger 5 to balance the bridge e...