Same-model multi-person cooperative operation method for BIM pipe integration deepening design

A technology of deepening design and comprehensive model, applied in computer-aided design, calculation, special data processing applications, etc., can solve the problems of occupying working time, low completion, and dislocation of vertical pipeline components, so as to improve work efficiency. Effect

Pending Publication Date: 2020-12-18
ZHEJIANG QINYE COUNSTRUCTION GRP CO LTD +1
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Therefore, after the start of the project, the time left for the detailed design of the basement BIM pipe structure is often very tight. In many cases, only a preliminary optimization model with a low degree of completion can only be submitted, which hinders the promotion and application of BIM technology.
[0005] The current BIM comprehensive design work process is mainly divided into two steps: the first step, each BIM engineer models the structure, water, heating, and electrical sub-specialties at the same time, taking up about 1 / 5 of the total time; the second step, the After all the professional models are integrated, one person will carry out the optimization of the management and synthesis, and the remaining few people cannot provide help, which takes up about 4 / 5 of the total time. Obviously, the second step of the management and synthesis optimization takes up most of the working time
[0006] At present, the collaborative operation software on the market can only realize the collaborative work of different operators according to their specialties, and all professional models must be integrated in the management and comprehensive optimization stage, and single professional operations cannot work in the management and comprehensive optimization stage; or the models are divided by floors (generally divided into ground , underground), and then assigned to 2 people to work together, but the basement model that occupies the main workload still cannot realize the collaborative optimization of multiple people in the same model, the improvement efficiency is limited, and the model is divided by floor and optimized separately, which will easily lead to vertical pipe components going up and down Layer misalignment, the integration stage requires secondary rework adjustments

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Same-model multi-person cooperative operation method for BIM pipe integration deepening design
  • Same-model multi-person cooperative operation method for BIM pipe integration deepening design
  • Same-model multi-person cooperative operation method for BIM pipe integration deepening design

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] Below in conjunction with embodiment the present invention is described in further detail.

[0026] The BIM comprehensive model cannot truly realize the collaborative optimization of the same model on the collaborative platform at this stage. There are two fundamental problems: 1. In the same model, any professional model component is a unique graphic element, which can only be operated by a single user. When user A starts When operating a certain graphic element, all other users must queue up to wait for user A to complete the operation before they can operate the graphic element; 2. The 3D cutting frame is also regarded as a graphic element by the software, and it must be operated continuously during the optimization operation of the pipeline The 3D cutting frame can be used to cut the model at any position and zoom in and out. When a user uses the 3D cutting frame to cut and view the model, other users can only wait in line. This is the most fundamental reason why the...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the field of BIM deepening design, in particular to a same-model multi-person collaborative operation method for BIM pipe integration deepening design, which comprises the following steps that: a plurality of BIM deepening designers can realize the collaborative operation on a collaborative platform or a third-party collaborative platform of revit according to respectivelydistributed operation partitions, three-dimensional views and three-dimensional sectioning frames; a plurality of people simultaneously carry out BIM model management and comprehensive optimization design work, and the work efficiency of the BIM management and comprehensive optimization stage is improved in a multiplied mode.

Description

technical field [0001] The invention relates to the field of BIM detailed design, in particular to a multi-person collaborative operation method of the same model for the detailed design of BIM pipe comprehensive. Background technique [0002] The full English name of Building Information Model (BIM) is Building Information Model, which is a complete information model that can integrate engineering information, processes and resources in different stages of the project's life cycle into one model, which is conveniently used by Used by all parties involved in the project. With the high development of building informatization, Building Information Modeling (BIM) has also been widely promoted and applied by all parties in construction projects. [0003] Among the many applications of BIM, the detailed design of BIM pipeline synthesis (hereinafter referred to as pipeline synthesis) on the revit platform is the most mature. All the structural, water, heating and electrical mode...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06F30/13G06F113/14
CPCG06F30/13G06F2113/14Y02P90/30
Inventor 徐亮周天浩孙耀奇林灵鹏吴佳
Owner ZHEJIANG QINYE COUNSTRUCTION GRP CO LTD