Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Sponge city flood optimal scheduling method suitable for complex hydraulic connection

A sponge city and optimal scheduling technology, applied in climate change adaptation, data processing applications, special data processing applications, etc., can solve the complex coupling relationship of constraints, the experience scheduling method cannot achieve unified scheduling in the whole area, all time and space, and cannot be applied. And other issues

Pending Publication Date: 2020-12-18
NANCHANG INST OF TECH +1
View PDF0 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The empirical scheduling method and the traditional water resource scheduling method cannot consider complex network hydraulic connections. There are many time-space combinations of lake storage and discharge, control gate operation, and pump discharge flow decision-making. The coupling relationship of each constraint is complicated. The empirical scheduling method cannot be global, The unified scheduling of all time and space cannot give full play to the best effect of the sponge city project, so it cannot be applied to the complex flood scheduling problem of the sponge city

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Sponge city flood optimal scheduling method suitable for complex hydraulic connection
  • Sponge city flood optimal scheduling method suitable for complex hydraulic connection
  • Sponge city flood optimal scheduling method suitable for complex hydraulic connection

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0110] Pingxiang City, Jiangxi Province is one of the first batch of pilot cities for the construction of sponge cities in the country. The urban river and lake connection project is as follows. Pingshui Lake is formed after the original curved river section above Tianzhong hydrological station in Pingshui River is cut and straightened. The Chishan Tunnel on the upper reaches of the Wufeng River is connected to the lower reaches of the Huangtukai Reservoir. Multi-directional gates are arranged on both sides of the tunnel to control the direction of water flow through the combination of gates. During the dry season, water from the Huangtukai Reservoir can be diverted to Yuhu Lake to increase the landscape benefits. During the flood season, the upstream flow of the Wufeng River can be intercepted. Yuhu Lake is located in the middle reaches of the Wufeng River, and the exit is controlled by gates. The middle and lower reaches of Wufeng River divert water to E Lake through box cu...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a sponge city flood optimal scheduling method suitable for complex hydraulic connection. The method comprises the steps of building an urban hydraulic connection topological relation graph; determining main nodes of flood scheduling, and optimizing and calculating a time interval; determining a target function of flood scheduling according to the main control target of flood scheduling; determining a constraint condition of flood scheduling; establishing a flood scheduling model according to the target function and the constraint condition of flood scheduling; accordingto the priority of the target function of flood scheduling, a hierarchical optimization method is adopted, the optimal calculation time interval of flood scheduling is combined, a flood scheduling model is optimized and solved, a flood scheduling system is integrated, and urban flood scheduling is guided according to the optimal scheduling result of the flood scheduling model. Aiming at the sponge city flood scheduling problem with complex mesh hydraulic connection, blindness of an existing experience scheduling mode can be avoided, scientific and refined scheduling of the city flood problemis achieved, and city flood disaster loss is eliminated or reduced to the maximum extent.

Description

technical field [0001] The invention relates to the technical field of urban flood control and disaster reduction, and more specifically relates to a sponge city flood optimization dispatching method applicable to complex network hydraulic connections. Background technique [0002] Urban flood control and disaster reduction is one of the main purposes of sponge city construction. Sponge city construction aims to maintain or restore the city's "sponge" function through various technologies such as infiltration, stagnation, storage, purification, use, and drainage, and realize a benign urban hydrological cycle. . From the perspective of non-engineering measures, in order to systematically and efficiently exert the functions of the project on flood reduction, transfer, regulation and storage, and achieve the purpose of effectively eliminating or mitigating urban rain and flood disasters, carry out urban flood optimization dispatching work, and form a scientific dispatching Dec...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/26G06F30/18
CPCG06Q10/06315G06Q50/26G06F30/18Y02A10/40
Inventor 康传雄桂发亮黄监初白桦王涛
Owner NANCHANG INST OF TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products