[0028] The present invention will be further described below in conjunction with specific embodiment:
[0029] A kind of PCCP pipeline construction method, concrete steps are:
[0030] S1, pipe groove excavation
[0031] Before trench excavation, measure the excavation plane position, pipeline axis distance, and horizontal elevation. Trench excavation should be carried out layer by layer and segmented from top to bottom. The excavation height of each layer is 2-3m. When excavating, reserve To stabilize the slope slope, when the excavation elevation reaches 20-30cm above the bottom of the pipe, manual excavation is used to avoid disturbance or over-excavation of the pipe foundation;
[0032] S2. Pipeline basic treatment
[0033] When the bearing capacity of the pipeline foundation is less than the bearing capacity of the pipeline and the upper covering soil, it is necessary to replace the foundation and backfill with crushed stones. Backfill some medium-coarse sand between th...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com