Inspection and evaluation methods, equipment and storage equipment for long-distance small-section water conveyance tunnels
A water tunnel and small-section technology, applied in the field of project management, can solve problems such as project delay, no evaluation method, and impossibility of implementation, and achieve the effect of reducing construction cost and construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0018] In order to make the objectives, technical solutions and advantages of the present invention clearer, the embodiments of the present invention will be further described below with reference to the accompanying drawings.
[0019] Please refer to figure 1 , a long-distance small-section water conveyance tunnel inspection and evaluation method and equipment, including the following:
[0020] S101: Perform a systematic analysis on the inspection plan of the long-distance small-section water conveyance tunnel, and obtain an analysis result; the analysis result includes: factors affecting the duration of the inspection plan, factors affecting the cost of the inspection plan, and factors for optimizing the inspection plan;
[0021] S102: According to the factors affecting the cost of the inspection plan, establish a time evaluation model for the inspection plan of the long-distance and small-section water conveyance tunnel based on the process framework; the time evaluation mo...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


