Novel ash bucket for building
A new type of ash and construction technology, applied in the direction of construction, building structure, building materials, etc., can solve the problems of affecting the service life, increasing the overall weight, and difficult to carry, so as to reduce damage, reduce friction, and achieve good results Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0017]Example 1figure 1 versusfigure 2 As shown, a new type of ash bucket for construction includes an ash bucket body 1, a first side ear 5 and a second side ear 6 are fixedly installed at the top edge of the ash bucket body 1, and the first side ear 5 and the second side ear 6 are fixed between The portable barrel bow 2 is connected. The portable barrel bow 2 is provided with a sheath 3 in the structure, and the sheath 3 is arranged in the center. A first strong adhesive is arranged between the sheath 3 and the portable barrel bow 2. The inner wall of the sheath 3 The first strong adhesive is glued to the outer wall of the portable bucket bow 2, and the outer wall of the sheath 3 is provided with a non-slip groove. The sheath 3 can protect the hands and prevent the hands from being damaged during the lifting process. Hand barrel bow 2 strangled.
Embodiment 2
[0018]Example 2 is based on Example 1, such asfigure 1 As shown, the structure of the ash bucket body 1 is provided with a reinforced steel ring 4, which is close to the top edge of the ash bucket body 1, and a second strong adhesive is provided between the ash bucket body 1 and the reinforced steel ring 4. The inner wall of the reinforced steel ring 4 is glued and fixed to the outer wall of the ash bucket body 1 through a second strong adhesive. The reinforced steel ring 4 is close to the top edge of the ash bucket body 1, which can strengthen the ash bucket body 1 and prevent ash. The top opening of the barrel body 1 is greatly deformed.
Embodiment 3
[0019]Example 3 is based on Example 1, such asfigure 2 As shown, the sides of the first side ear 5 and the second side ear 6 close to the axial centerline of the ash bucket body 1 are fixedly installed with a second reinforcing steel sheet 8 through rivets, and the first side ear 5 and the second side ear 6 are far away from the ash bucket. One side of the axial centerline of the main body 1 is fixedly installed with a first reinforcing steel sheet 7 by rivets. The middle of the first reinforcing steel sheet 7 and the second reinforcing steel sheet 8 are provided with a through hole. The sheet 7 and the second reinforcing steel sheet 8 can strengthen the first side ear 5 and the second side ear 6 and reduce the damage caused by the bucket bow 2 to the first side ear 5 and the second side ear 6, thereby increasing its service life.
PUM