Shale gas horizontal well segmented repeated fracturing method
A technology for repeated fracturing and horizontal wells, applied in the field of oil drilling, can solve the problems of insignificant improvement of the complexity of far-well fractures, poor flow follow-up of temporary plugging balls, and narrow fracture width, etc., to improve the construction effect and method. Clarity and the effect of increasing the volume of the transformation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0066] Well A has a vertical depth of 2146m, a horizontal section length of 1560m, and 15 stages of initial fracturing. By the method provided by the present invention, the steps are as follows:
[0067] (1) Perform repeated fracturing and segmentation for the horizontal wellbore that has undergone initial fracturing. The five stages of the initial fracturing stage are divided into three stages as a large stage of refracturing. From target point B to target point A are the first, second and third stages of repeated fracturing. Taking the construction of the first large section as an example, the construction process is explained.
[0068] (2) Prepare liquid temporary plugging agent to block the second and third sections. Polymers with low-harm characteristics are preferred. After formula adjustment, each liquid system has different delayed crosslinking time and gel breaking time. The viscosity of liquid temporary plugging agent in each section is required to be 200mPa.s. ...
Embodiment 2
[0083] Well B has a vertical depth of 2238m, a horizontal section length of 1850m, and 20 stages of initial fracturing. By the method provided by the present invention, the steps are as follows:
[0084] (1) Perform repeated fracturing and segmentation for the horizontal wellbore that has undergone initial fracturing. The five stages of the initial fracturing stage are divided into four stages as a large stage of refracturing. From target point B to target point A are the first, second, third and fourth stages of repeated fracturing. Taking the construction of the first large section as an example, the construction process is explained.
[0085] (2) Prepare liquid temporary plugging agent to block the second, third and fourth sections. Polymers with low-harm characteristics are preferred. After formula adjustment, each liquid system has different delayed crosslinking time and gel breaking time. The viscosity of liquid temporary plugging agent in each section is required to...