Method applied to evaluation of flow conductivity of shale-gas-combined sand fracturing fracture

The invention discloses a method applied to evaluation of flow conductivity of shale-gas-combined sand fracturing fracture. The method comprises the following steps: a, simulating a sand bar transporting process in shale-gas-slickwater-combined sand fracturing fracture by means of an experiment device for simulating flowing of proppants in a visual fracture net to obtain sand bar transporting video of the combined sand fracturing fracture under different experiment conditions; b, obtaining a distribution curve of the proppants with different particle diameters by virtue of a gray processing method and a point-by-point scanning method and obtaining distribution shape function of the proppants with different particle diameters by virtue of a linear regression method; c, building the sand bar distribution shape function of an API flow guide chamber by utilizing geometric similarity principle according to the size of the API flow guide chamber, paving shapes of the corresponding proppants and implementing evaluation of flow conductivity of shale-gas-combined sand fracturing fracture. The method is capable of simply and accurately implementing quantitative evaluation of the flow conductivity of shale-gas-combined sand fracturing fracture; experiment support is provided for optimizing the combined sand fracturing design and improving the flow conductivity of the shale fracturing fracture.
Owner:BC P INC CHINA NAT PETROLEUM CORP +1

Hydraulic fracturing and methane in-situ blasting cooperative fracturing permeability-increasing method

ActiveCN113294134ARealize synergistic fracturing and anti-reflectionIncrease the volume of the transformationFluid removalMining engineeringWell drilling
The invention relates to a hydraulic fracturing and methane in-situ blasting cooperative fracturing permeability-increasing method which is suitable for shale gas reservoir exploitation. The method comprises the steps that horizontal drilling construction is conducted on a to-be-constructed area, and then cracks are formed around the hole wall of a horizontal drill hole through energy-gathered perforation; the cracks around the horizontal drill hole continue to be expanded in a hydraulic fracturing mode, and methane extraction is conducted after fracturing fluid is discharged; after methane gas is reduced, in-situ blasting fracturing is conducted on methane participating in the horizontal drill hole; after blasting, the cracks in the horizontal drill hole continue to be expanded, so that the methane continues to seep, and then extraction continues to be conducted; and blasting fracturing and extraction operation are repeated, so that blasting cooperative fracturing permeability increasing is achieved, and the shale gas exploitation effect is greatly enhanced. The method is reasonable in design, high in construction operation feasibility and suitable for fracturing transformation of unconventional oil and gas reservoirs such as shale gas reservoirs, coal bed gas reservoirs and tight sandstone gas reservoirs.
Owner:CHINA UNIV OF MINING & TECH

Downhole directional hydraulic jetting tool ground control method

The invention discloses a downhole directional hydraulic jetting tool ground control method. The downhole directional hydraulic jetting tool ground control method comprises that a, when reaching a jetting well depth position, the downhole directional jetting tool is started by means of ground control; b, after the downhole directional jetting tool is started, the circumferential orientation of a jet hole along the borehole is identified, after it is determined that the jet hole is in the downhole initial circumferential orientation, contrastive analysis is carried out on the initial circumferential orientation and a set final jetting orientation, and the direction and angle by which a spray gun needs to rotate are obtained; c, the spray gun is controlled to rotate by the needed direction and angle, the circumferential orientation of the jet hole along the borehole is adjusted to the appointed orientation; and d, after the jet hole in the pray gun is adjusted in place, directional jetted particle perforation is started, and fracture acidizing construction is carried out. According to the invention, the orientation of the jet hole can be adjusted, influence brought by downhole obstructions and spray gun vibrations can be effectively prevented, the directional jetting task can be completed reliably, and interference brought by rotation of the tool during the descending process can be avoided.
Owner:BC P INC CHINA NAT PETROLEUM CORP +1

Multi-cluster perforation fracturing method with variable perforation size and variable perforation density and uniform liquid feeding and sand feeding

The invention discloses a multi-cluster perforation fracturing method with a variable perforation size and variable perforation density and uniform liquid feeding and sand feeding. The multi-cluster perforation fracturing method is characterized in that the displacement of each cluster perforation is equal, and is equal to the total injection displacement divided by the number of clusters of perforations in segments. The multi-cluster perforation fracturing method comprises the steps that (1) key reservoir parameters are evaluated; (2) segment cluster locations are determined; (3) crack parameters are optimized; (4) fracturing construction parameters are optimized; (5) adjacent well segment cluster is subjected to liquid feeding and proppant feeding monitoring parameter analysis; (6) average displacement of each cluster of perforations is subjected to distribution; (7) pressure of the wellbore at each cluster of perforations of a horizontal wellbore is calculated; (8) adjustment of thenumber of perforations and aperture of each cluster perforations are performed; (9) fine adjustment of overall cluster perforation scheme in the segments is performed; (10) a bridge plug is lowered and the cluster perforations are subjected to joint operation; (11) acid pretreatment and prepad liquid width generating and sand-carrying fluid sand feeding are performed; and (12) replacement operation is performed. The multi-cluster perforation fracturing method increases the uniformity of liquid feeding and sand feeding between the perforation clusters, improves the distribution of the fracturing fluid and the proppant between the perforation clusters, increases the overall transformation volume of the cracks, and maximizes the reservoir yield-increasing effect.
Owner:CHINA PETROLEUM & CHEM CORP +1

Atmospheric shale gas volume fracturing method using horizontal wellbore which bores through multiple layers

The invention discloses an atmospheric shale gas volume fracturing method using a horizontal wellbore which bores through multiple layers. The method comprises the steps of (1) reservoir evaluation before fracturing; (2) fracture three-dimensional extension scale simulation and analysis; (3) hydraulic jetting perforating parameter designing, wherein hydraulic nozzles are distributed in the same plane, fractures with no special requirements on upward extension or downward extension are evenly distributed at the same plane, and for fractures which need to excessively extend upwards or downwards,an uneven hole arrangement mode is adopted in the upper semi-circumference position or the lower semi-circumference position on the cross section of a hydraulic jetting pipe string; (4) injection mode designing, wherein a high-viscosity glue solution is adopted for the injection mode, and a pre-injection mode is conducted while matched with the designed maximum delivery; (5) variable-density supporting agent optimization; (6) real-time improvement of construction parameter designing and adjustment of the main fracture net pressure. By means of the method, the yield-increasing potential of a shale gas reservoir is tapped to the utmost extent, and the success rate of fracturing is improved; the requirements of volume fracturing of the shale oil and gas reservoir are met, and the method is beneficial to application and popularization of a hydraulic fracturing technology.
Owner:CHINA PETROLEUM & CHEM CORP +1

Ordinary-pressure shale gas screen pipe completion hydraulic injection volume fracturing method

The invention discloses an ordinary-pressure shale gas screen pipe completion hydraulic injection volume fracturing method. The ordinary-pressure shale gas screen pipe completion hydraulic injection volume fracturing method comprises the steps that (1) evaluation of key parameters of a shale before fracturing is performed; (2) the hydraulic injection position is determined; (3) fracture parametersare optimized; (4) fracturing construction parameters are optimized; (5) sandblasting perforation fracturing operation is performed through large diameter coiled tubing or 3<1 / 2>in conventional tubing; (6) acid pretreatment operation is performed; (7) low-viscosity slickwater fracturing fracture-forming construction is performed, and low-viscosity slickwater with the viscosity of 1mPa.s-2mPa.s isadopted for communicating and extending more small micro-scale fracture systems; (8) low-viscosity slickwater 70 mesh-140 mesh proppant injection construction is performed; (9) high-viscosity glue solution sand fracturing construction is performed; and (10) displacing operation is performed. The ordinary-pressure shale gas screen pipe completion hydraulic injection volume fracturing method can ensure that multi-cluster volume fracturing construction is performed on an ordinary-pressure shale gas horizontal well, can greatly increase the transforming volume of an ordinary-pressure shale gas fracturing fracture, and improves the development level of ordinary-pressure shale gas. The development of the ordinary-pressure shale gas becomes cost-effective.
Owner:CHINA PETROLEUM & CHEM CORP +1

Small fracturing test method suitable for shale gas well

The invention provides a small fracturing test method suitable for a shale gas well. The method comprises the following steps that (1) acid pretreatment is conducted, (2) the stable injection time and liquid quantity of the highest discharging quantity are determined; (3) step increasing is conducted, specifically, the discharging quantity is gradually increased to the highest discharging quantity in a stepped mode; (4) step decreasing is conducted, specifically, the discharging quantity is gradually decreased from the highest discharging quantity in a stepped mode; and (5) pressure decreasing testing is conducted, specifically, after fracturing pumping stopping, pumping stopping and well shutdown are conducted for a preset time till an inflection point appears at the pressure decreasing curve. According to the small fracturing test method suitable for the shale gas well, key characteristic parameters, such as the minimum horizontal principal stress, the fracture closure time, the natural fracture development degree and the stratum leak-off condition, of a shale formation can be obtained, the effect of fractural diverting inducing is achieved, a foundation is laid for fractural diverting or complex fracture forming in main fracturing, the transformation size of main fracturing is increased, and the fracturing effect of main fracturing is improved. The small fracturing test method is reasonable in design, simple in technique and convenient to operate.
Owner:CHINA PETROLEUM & CHEM CORP +1

Method for improving complexity of fracture and construction efficiency of horizontal well

The invention discloses a method for improving the complexity of a fracture and the construction efficiency of a horizontal well, and is designed to solve the problems, such as low complexity and small discharge volume of the fractured fracture of the horizontal well. The method is characterized in that a plurality of the horizontal wells are deployed in the same well site, shafts of the horizontal wells are parallel mutually, and each shaft is perpendicular to a maximum principal stress direction of a stratum; positions of perforated intervals of each adjacent well are distributed in a staggered manner; each adjacent well is fractured in sequence in a staggered manner. In the process of fracturing, as each shaft is subjected to stress interference caused by staggered fracturing in sequence, a large amount of high-complexity microfractures in staggered distribution are generated on both sides of each fracture, thus the reconstruction volume of an oil layer is increased, and the single-well yield is improved. In addition, the intervals between the fracturing sections of the horizontal wells are lengthened, thus the number of the fracturing sections can be decreased, the single-well fracturing cycle can be shortened, and the construction efficiency can be greatly enhanced.
Owner:PETROCHINA CO LTD

Spacing optimizing method for horizontal well volume fracturing clusters

The invention provides a spacing method for horizontal well volume fracturing clusters. A finite element numerical simulation method is adopted, on the basis of ABAQUS finite element software, from the two aspects of reduction of the disadvantageous influence of the stress penumbra effect and utilization of the advantageous influence of the stress penumbra effect, a smallest cluster spacing optimizing model and a largest transformed volume cluster spacing optimizing model are built; the stress steering angle and the transformed volume are calculated; and finally, the optimal cluster spacing is determined by combining the optimized result of the smallest cluster spacing and the largest transformed volume cluster spacing. On the one hand, major fractures successively extend out, a horizontal well is segmentally fractured into a stratum to form the multiple major fractures, and on the other hand, the induced stress between the fractures is large as possible, so that branched fractures turn, the connectivity of natural fractures including the branched fractures and the major fractures is enhanced, a channel structure of oil gas flowing towards the major fractures is improved, and finally the purpose for improving the production capacity of an oil gas well is achieved.
Owner:CHINA NAT PETROLEUM CORP CHUANQING DRILLING ENG CO LTD CHANGQING DOWNHOLE TECH CO

Horizontal well back-mixing, fracturing and pumping-in method for compact reservoir oil deposit

The invention provides a horizontal well back-mixing, fracturing and pumping-in method for a compact reservoir oil deposit. The horizontal well back-mixing, fracturing and pumping-in method comprisesthe following steps: a first prepad fluid stage, wherein the first prepad fluid is injected into a target measure layer, and the first prepad fluid is high-viscosity fracturing fluid; a second prepadfluid stage, wherein second prepad fluid is injected into the target measure layer and a supporting agent is added in a slug mode, and the second prepad fluid is low-viscosity fracturing liquid; a sand-carrying fluid stage, wherein sand-carrying fluid is injected into the target measure layer, and the supporting agent is continuously added, and the sand-carrying fluid is high-viscosity fracturingliquid. Through a back-mixing, fracturing and pumping-in process of sequentially injecting the fracturing liquid into the target measure layer according to a sequence, from high to low and then from low to high, of viscosity of the fracturing liquid, so that effective formation of a complex seam net is realized while multiple perforation clusters in horizontal wall multi-section fracturing are ensured to be fractured in a balanced mode, and therefore, modification area is increased, and the oil well yield is increased.
Owner:CHINA UNIV OF PETROLEUM (BEIJING)

Composite temporary plugging steering repeated fracturing method suitable for shale gas long horizontal well

The invention discloses a composite temporary plugging steering repeated fracturing method suitable for a shale gas long horizontal well, and the method comprises the following steps: performing squeezing construction, and supplementing energy to a pressure failure area of an old well; performing multi-stage steering main fracturing, and dredging old fractures; plugging a hole of a primary fracturing part through a temporary plugging ball, and then performing sand fracturing construction through fracturing fluid, and reconstructing a primary fracturing under-transformation area; enabling the fracturing fluid to carry an in-fracture diverting agent, so as to promote the steering of the fracture, and improve the fracture complexity; after the diverting agent in the fracture reaches the stratum, continuing the sand fracturing construction, and further reconstructing the primary fracturing insufficient and unmodified areas. According to the invention, a tubular column does not need to be tripped in or dragged, the field construction operability is high, the construction period is greatly shortened, the cost is low, the utilization rate of the horizontal section of the shale gas horizontal well can be increased, the shale gas well is recovered or the productivity is increased, low-cost repeated fracturing transformation of the shale gas long horizontal well is met, and the economicbenefits of a shale gas field are increased.
Owner:CHINA PETROLEUM & CHEM CORP +1

Multistage dynamic temporary blocking volume acid fracturing method

The invention discloses a multistage dynamic temporary blocking volume acid fracturing method. According to the multistage dynamic temporary blocking volume acid fracturing method,"multistage physical temporary blocking" and "multistage chemical temporary blocking" are treated as principle thinking, and multistage hydraulic fracturing with sand and multistage injection acid fracturing are combined. According to pump injection sequence of front-loading linear glue with certain concentration to make seams, saturating a reservoir, improving flow conductivity of fractures by propping agents with the small grain size or composite grain size, and injecting degradable acid-resistant fiber temporary blocking fluid, through multistage with large displacement, the fracture physical steering transformation is achieved; and then through a multistage interval type with large displacement, different types of acid liquors "mutual solvent, gelled acid, steering acid..., mutual agent" are injected, and thus fracture chemical temporary blocking steering transformation is achieved. According to the multistage dynamic temporary blocking volume acid fracturing method,the pertinence and the flow conductivity of the reservoir are improved, the loss of the acid liquors are lowered, the etching length of the fractures are increased, the transforming volume of the reservoir is enlarged by fracture steering, and thus the target that the individual well producing rate is improved by effective transformation of the cloud-like carbonate rock reservoir is achieved.
Owner:PETROCHINA CO LTD

Radial multi-branch drilling and temporary plugging fracturing combined well completion method and device, and application

The invention provides a radial multi-branch drilling and temporary plugging fracturing combined well completion method and device, and application. The radial multi-branch drilling and temporary plugging fracturing combined well completion method comprises the steps that data interpretation results such as earthquakes, well logging and oil reservoir numerical simulation are comprehensively utilized, and a high-pore pressure region reservoir is determined; casing cutting window is completed, and multi-branch radial holes are drilled in the high-pore pressure region reservoir through high-pressure water jet spraying drill bits conveyed by a continuous pipe and a high-pressure hose; and the continuous pipe, the high-pressure hose and the spraying drill bits do not need to be pulled out, temporary plugging fracturing liquid containing a temporary plugging agent is pumped directly through the continuous pipe to fracture the radial holes, and pipe string radial multi-branch drilling and temporary plugging fracturing combined well completion is achieved. A high-pressure area with rich reserves directionally communicates through the multi-branch holes, fracturing cracks are induced to beinitiated, meanwhile, a temporary plugging agent material plugs the dominant cracks extending towards a low-pressure area, thus the cracks turn to the high-pressure area, effective communication and utilization of the reserves in the high-pressure area are achieved, and the unconventional oil and gas recovery rate is increased.
Owner:CHINA UNIV OF PETROLEUM (BEIJING)

Fine layering reconstruction method

The invention relates to a fine layering reconstruction method. The method includes the following steps: S101, collecting geology, well drilling, well detection, well logging and well cementation dataand production situations of a to-be-fractured well, calculating rock mechanics parameters, and determining a well completion mode and a perforation scheme; S102, designing a fracturing scheme, and determining the number of fracturing fissures and parameter optimization, wherein parameter optimization includes sand adding scale optimization with continuous section interpretation of ground stressas a basis, construction parameter optimization with obtaining of expected fissure support as a target, and fracturing optimization control with test fracturing as a basis; and S103, ensuring fracturing fluid performance, adjusting a main fracturing pump sequence and providing a temporary plugging agent in a construction process to ultimately increase single-well yield and control reserves. According to the fine layering reconstruction method provided by the invention, the complex network fissures can be formed, a larger reconstruction volume can be obtained, and then the single-well yield andoil and gas recovery ratios are significantly increased. In addition, the method is simple to operate, is lower in costs, and has important significance for development of oil and gas fields.
Owner:大庆中联信实石油科技开发有限公司

Method for promoting balanced expansion of multiple clusters of fractures through ball throwing temporary plugging

The invention discloses a method for promoting balanced expansion of multiple clusters of fractures through ball throwing temporary plugging. The method comprises the following steps that the whole fracturing construction process of one fracturing section is divided into N stages, and first-stage fracturing is implemented, wherein different types of combined fracturing fluids capable of promotingcrack initiation and expansion are injected into a wellbore; second-stage fracturing is implemented, wherein fracturing fluids are injected continuously, degradable temporary plugging balls are put into the wellbore to be used for temporarily plugging holes of perforation clusters to limit expansion of dominant hydraulic fractures, and fracturing fluids are injected continuously to promote expansion of non-dominant fractures; the subsequent several stages of fracturing construction processes are performed similar to the second-stage fracturing construction process until the construction of thefracturing section is completed; and subsequent construction of other fracturing sections is completed according to the above process, and finally balanced fracturing transformation of the whole horizontal section reservoir is realized. According to the method, the unbalanced expansion phenomenon of multi-cluster fractures can effectively relieved, the reservoir transformation volume is increased, the oil and gas recovery ratio is increased, and the method is widely suitable for various reservoir types.
Owner:CHINA PETROLEUM & CHEM CORP +1

New method for increasing reservoir reconstruction volume through subdivision cutting and temporary plugging steering combined technology

The invention relates to a new method for increasing the reservoir reconstruction volume through a subdivision cutting and temporary plugging steering combined technology, and belongs to the field ofpetroleum and natural gas exploitation. The invention aims to provide the new method for increasing the reservoir reconstruction volume through the subdivision cutting and temporary plugging steeringcombined technology to solve problems, subdivision cutting of a horizontal well is achieved through fast drilling bridge plugs and high-density clustered jet holes, and fracturing fluid and active fluid are injected to open a first-stage artificial fracture in a pressing mode; then sand-carrying fluid containing cleaning steering material fluid is injected to temporarily plug the fracture which ispressed to be open before and a blast hole, the fracture is forced to steer longitudinally, and displacement fluid is used for displacing; and finally a fracture lattice structure is formed. According to the new method, through an adopted subdivision cutting method, high-density artificial fracture well completion is conducted to sufficiently cut a reservoir so as to achieve reservoir working volume maximization, and the production efficiency of all jet hole clusters can be improved by combining with a temporary plugging steering technology; and meanwhile, large-displacement fracturing construction is conducted, the complexity degree of the artificial fractures can be increased, the petroleum leakage area is increased, and the reservoir reconstruction volume is increased.
Owner:CHINA UNIV OF PETROLEUM (BEIJING) +2

Method for production increasing through repeated transformation based on complex crack network

The invention provides a method for production increasing through repeated transformation based on a complex crack network. Formation wax and inorganic scale are removed by means of the method that plug removal liquid is injected into a target layer section, then repeated fracturing construction is conducted in a support-free mode, the reservoir transforming volume is enlarged, formation energy isreplenished, fracturing liquid does not flow back after fracturing construction is completed, and by shutting in a well for pressure enlarging, old-well production increasing is achieved. According to the method for production increasing through repeated transformation based on the complex crack network, firstly, by adopting the large-displacement, low-frictional-resistance-slickwater, and support-free modes, repeated fracturing construction is conducted, based on the original complex crack network, the reservoir transforming volume is further enlarged, and the stratum energy is replenished;and secondly, by shutting in the well, under the pressure effect of capillarity tubes, low-frictional-resistance slickwater and remaining oil in medium and small pore throats or matrixes are subjectedto dialysis replacement, and thus the oil well yield and the final recovery percent are increased.
Owner:PETROCHINA CO LTD

Crack forming method for multiple scales of cracks

The invention discloses a crack forming method for multiple scales of cracks. The crack forming method comprises the following steps that basic parameters comprising micro pore-throat structure parameters, rock mechanics parameters and ground stress characteristics of a rock core of a reservoir stratum are measured; artificial rock samples are prepared according to the basic parameters, physical simulation experiments for rock core crack rupture and extension are carried out on the artificial rock samples, and the rupture pressure characteristics and elongation characteristics of the artificial rock samples under different fracturing fluid viscosity and displacement combination are determined; based on the rupture pressure characteristics and elongation characteristics determined by the physical simulation experiments, a crack forming technology for the two or more levels of scales of cracks is determined through a reservoir crack extension physical simulation system; and sequential crack forming construction of the multiple scales of cracks is conducted according to the crack forming technology. According to the crack forming method, the complexity of the fracturing cracks can beincreased, the crack forming success rate of the complex cracks is increased, thus the reservoir transformation volume is increased, and efficient production increasing and stable production are achieved.
Owner:CHINA PETROLEUM & CHEM CORP +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products