Horizontal well fracturing method for promoting multi-cluster cracking through repeated acid injection and temporary plugging
A horizontal well and acid injection technology, applied in the field of fracturing, can solve the problem that the perforation clusters are difficult to be simultaneously depressurized
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0071] A shale gas well has a vertical depth of 2198m, a sounding depth of 4385m, and a horizontal section length of 1565m. Follow the steps below to retrofit:
[0072] (1) Coiled tubing is used to carry a perforating gun to complete the first stage of perforating operation. Among them, the perforations are arranged in a spiral manner, the perforation length is 3m in total, the perforation density is 16 holes / m, the number of perforation clusters is 6 clusters, and there are 48 perforation holes in total;
[0073] After the first section of perforation operation, with 1m 3 A total of 10m of pretreatment acid is injected per minute 3 . then at 4m 3 The displacement per minute injects 45m of low-viscosity slippery water 3 For acid. Subsequent reduction in displacement to 1m 3 / min inject low viscosity slippery water 5m 3 Replace acid to increase acid rock reaction time.
[0074] Final injection 50m 3 High-viscosity glue 40mPa.s makes the main seam.
[0075] (2) Inject...
Embodiment 2
[0090] A shale gas well has a vertical depth of 2375m, a sounding depth of 4500m, and a horizontal section length of 1726m. Follow the steps below to retrofit:
[0091] (1) Coiled tubing is used to carry a perforating gun to complete the first stage of perforating operation. Among them, the perforations are arranged in a spiral manner, the perforation length is 3m in total, the perforation density is 16 holes / m, the number of perforation clusters is 6 clusters, and there are 48 perforation holes in total;
[0092] After the first section of perforation operation, with 1m 3 A total of 10m of pretreatment acid is injected per minute 3 . then at 4m 3 The displacement per minute injects 45m of low-viscosity slippery water 3 For acid. Subsequent reduction in displacement to 1m 3 / min inject low viscosity slippery water 5m 3 Replace acid to increase acid rock reaction time.
[0093] Final injection 50m 3 High-viscosity glue 45mPa.s makes the main seam.
[0094] (2) Inject...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com