Reverse construction method for pipe-jacking bricked working well

A construction method and technology for working wells, which can be applied to artificial islands, water conservancy projects, infrastructure projects, etc., and can solve problems such as uneconomical construction techniques

Inactive Publication Date: 2021-03-02
CHINA NAT CHEM ENG NO 14 CONSTR
View PDF5 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Although the "Code for Construction and Acceptance of Water Supply and Drainage Pipelines" requires that the diameter of the pipe-jacking work well must be greater than or equal to the design diameter, it was found during the c

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Reverse construction method for pipe-jacking bricked working well
  • Reverse construction method for pipe-jacking bricked working well
  • Reverse construction method for pipe-jacking bricked working well

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0033]A top-down construction method for a pipe jacking brick working well. The steps include: 1) determining the thickness of the shaft wall; 2) measuring, laying out and positioning; 3) earthwork excavation; 4) well chamber masonry; 5) well bottom construction 6) Pouring the side walls of the well and 7) Backfilling the well.

[0034]This example uses a pipe jacking construction work well project used in a town’s sewage treatment project as an example to illustrate the method.

[0035]The construction process of this example:

[0036]Determine the thickness of the shaft wall → measurement, laying out, positioning → first layer of earthwork → first layer of reinforced concrete ring beam pouring, shaft wall masonry → control of shaft diameter → second layer of earthwork → second layer of reinforced concrete Ring beam pouring, shaft wall masonry→……→control well chamber diameter→last layer of earthwork→last layer of reinforced concrete ring beam pouring, shaft wall masonry→water pump drainage→...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a reverse construction method for a pipe-jacking bricked working well. The method comprises the following steps of 1) determining the wall thickness of the well; 2) carrying out measuring, paying off and positioning; 3) carrying out earth excavation; 4) building a well chamber; 5) carrying out well bottom construction; 6) pouring a well chamber inner side protection wall; and 7) backfilling the well chamber, wherein in the step 3) and the step 4), earth excavation, well wall building and reinforced concrete ring beam pouring are conducted layer by layer from top to bottom, after construction of the upper layer is completed, construction of the next layer is conducted till all building work of the well chamber is completed, and steel bars of a lower-layer ring beam need to be pre-buried when the upper-layer well wall is built. When the well wall is built, the method for controlling the diameter of the well chamber comprises the steps that after the first layer ofwell chamber is excavated, part of the wall body is built firstly, then two steel pipes are crossed to form a cross shape, and the steel pipes are hung down from the center of the well chamber and fixed to the built wall body; and plumb bobs are tied to the two ends of each steel pipe, the distance between the paired plumb bobs corresponds to the inner diameter of the well chamber, and the plumbbobs and plumb bob lines are used as references for a bricklayer during bricklaying.

Description

Technical field[0001]The technical scheme belongs to the technical field of engineering construction, and specifically is a construction method of a reverse construction method for a pipe jacking brick working well.Background technique[0002]Pipe jacking construction is a non-excavation construction method, which is a construction technique for pipeline burying facilities without excavation or less excavation. Pipe jacking method construction is to overcome the friction between the pipeline and the surrounding soil with the help of jacking equipment in the working well, push the pipeline into the soil according to the designed slope, and transport the soil away. After one section of the pipe has been jacked into the soil layer, the second section of the pipe will continue to be jacked. The principle is to push the tool pipe or roadheader from the working pit through the soil layer and hoist it in the receiving pit with the help of the thrust of the main top cylinder, the pipeline roo...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E02D29/12
CPCE02D29/12E02D29/125
Inventor 赵丰荣万疆黄洪明练海钧
Owner CHINA NAT CHEM ENG NO 14 CONSTR
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products