Power supply path construction method and system based on transformer substation and storage medium

A technology of power supply path and construction method, applied in the field of substations, can solve the problems of labor-intensive, complex power supply path construction, large labor, etc., and achieve the effect of saving labor, simple and fast construction

Pending Publication Date: 2021-03-12
SHENZHEN POWER SUPPLY BUREAU
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, it takes a lot of manpower to analyze the topological connection relationship of the equipment manually, combined with the real-time switch information of the system, analyze the power supply relationship of the equipment, and construct the power supply path, which requires a lot of manpower, and the professionalism and experience of the analysts are also limited. Certain requirements, so the existing power supply path construction is complex and labor-intensive

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Power supply path construction method and system based on transformer substation and storage medium
  • Power supply path construction method and system based on transformer substation and storage medium
  • Power supply path construction method and system based on transformer substation and storage medium

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0045] The conception and technical effects of the present invention will be clearly and completely described below in conjunction with the embodiments, so as to fully understand the purpose, features and effects of the present invention. Apparently, the described embodiments are only some of the embodiments of the present invention, rather than all of them. Based on the embodiments of the present invention, other embodiments obtained by those skilled in the art without creative efforts belong to The protection scope of the present invention.

[0046] In the description of the embodiments of the present invention, if it involves "several", it means more than one, if it involves "multiple", it means more than two, if it involves "greater than", "less than", "more than ", should be understood as not including the original number, if it involves "above", "below", and "within", it should be understood as including the original number. If "first" and "second" are involved, it shou...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a power supply path construction method and system based on a transformer substation and a storage medium. The power supply path construction method based on the transformer substation comprises the steps: acquiring equipment information from starting point equipment to multiple pieces of pre-connection equipment of the transformer substation; obtaining an equipment parameter and an equipment connection relationship according to the equipment information; filtering the plurality of pieces of pre-connected equipment according to the equipment parameters and the equipmentconnection relationship to obtain equipment to be connected; and connecting any two piece of to-be-connected equipment according to the device connection relationship to construct a power supply path. According to the method and system, after the multiple pieces of pre-connection equipment from the starting equipment to the transformer substation are obtained, the multiple pieces of pre-connection equipment are filtered according to the equipment parameters and the equipment connection relationship to obtain the to-be-connected equipment, and then any two pieces of to-be-connected equipment are connected according to the equipment connection relationship to construct the power supply path, so that the power supply path is simple and rapid to construct; and manpower is saved.

Description

technical field [0001] The present invention relates to the technical field of substations, in particular to a substation-based power supply path construction method, system and storage medium. Background technique [0002] The power supply network involves a large power supply area and many power supply customers, and the power supply network is composed of multiple substations, main transformers, switches and transmission lines. The equipment in the power supply network has a large volume, high power supply load, complex operation mode, and high reliability requirements. Generally, manual identification is used to ensure that the power supply equipment for the electric field is obtained. However, it takes a lot of manpower to analyze the topological connection relationship of the equipment manually, combined with the real-time switch information of the system, analyze the power supply relationship of the equipment, and construct the power supply path, which requires a lot ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/04G06F8/38G06Q50/06
CPCG06Q10/04G06F8/38G06Q50/06
Inventor 闫麟吴悠李祖强卢非凡李扬胡兆华王碧
Owner SHENZHEN POWER SUPPLY BUREAU
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products