Eureka AIR delivers breakthrough ideas for toughest innovation challenges, trusted by R&D personnel around the world.

Intelligent production scheduling method and device and computer storage medium

An intelligent, production line technology, applied in computing, manufacturing computing systems, instruments, etc., can solve problems such as time lag, mismatch between planning and execution, and inability to fully optimize business goals, so as to ensure matching and realize intelligent production scheduling Effect

Active Publication Date: 2021-03-16
深圳坤湛科技有限公司
View PDF3 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

A lot of production scheduling is still performed manually, even once a week. In the case of massive information, it will make it impossible to fully optimize business goals. At the same time, the time lag will also lead to a mismatch between planning and execution.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Intelligent production scheduling method and device and computer storage medium
  • Intelligent production scheduling method and device and computer storage medium
  • Intelligent production scheduling method and device and computer storage medium

Examples

Experimental program
Comparison scheme
Effect test

no. 1 example

[0076] refer to figure 2 , figure 2 For the first embodiment of the intelligent production scheduling method of the present application, the method includes:

[0077] Step S110: Perform polling calculation based on preset conditions, schedule locked orders, and generate locked order scheduling results.

[0078] The preset condition can be that the theoretical capacity of the locked order meets production delivery, the theoretical capacity of the locked order cannot be produced and delivered on schedule, and the limit capacity of the locked order can be produced and delivered on schedule, if the theoretical capacity of the locked order and the limit capacity None of them can be produced and delivered on schedule, and the production line of the locked order can be replaced, if neither the theoretical capacity nor the limit capacity of the locked order can be produced and delivered on schedule, and the production line of the locked order cannot be replaced, etc. Wherein, the ...

no. 2 example

[0155] refer to Figure 9 , Figure 9 For the second embodiment of the intelligent production scheduling method of the present application, the method further includes:

[0156] Step S210: Perform polling calculation based on preset conditions, schedule locked orders, and generate locked order scheduling results.

[0157] Step S220: After the locked order scheduling is completed, update the remaining theoretical production capacity of all production lines.

[0158] Step S230: Construct a mathematical scheduling model based on preset constraints, schedule non-locked orders, and generate non-locked order scheduling results.

[0159] Step S240: Based on the scheduling result of the locked order and the scheduling result of the non-locked order, generate a first scheduling plan.

[0160] Step S250: Based on the first production scheduling plan, perform batch calculation to obtain a second production scheduling plan.

[0161] Compared with the first embodiment, the second embod...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an intelligent scheduling method and device and a computer storage medium, and the method comprises the following steps: executing polling calculation based on a preset condition, carrying out the scheduling of a locking order, and generating a locking order scheduling result; after scheduling of the locking order is completed, updating residual theoretical capacities of all production lines; constructing a mathematical production scheduling model based on a preset constraint, scheduling the non-locking order, and generating a non-locking order production scheduling result; and generating a first scheduling plan based on the locking order scheduling result and the non-locking order scheduling result. According to the method, under the condition of meeting service rule constraints such as different order types and priorities and production line productivity, multiple service indexes including the overall delivery time satisfaction rate, the production line load balance rate and the production line production operation efficiency are comprehensively considered, and the executable production line shift schedule can be dynamically calculated and output in real time; and the service purpose of real-time and accurate intelligent production scheduling is achieved.

Description

technical field [0001] The present invention relates to the technical field of production, in particular to an intelligent production scheduling method, equipment and computer storage medium. Background technique [0002] In the shoe-making production process, information from multiple links is involved from order entry to final production scheduling. It is necessary to comprehensively weigh multiple business objectives to make decisions. Planning is the most important part of the manufacturing process. All information is in this Summarize links to generate a time match for each order and each production line. A lot of production scheduling is still performed manually, even once a week. In the case of massive information, it will make it impossible to fully optimize business goals. At the same time, the time lag will also lead to a mismatch between planning and execution. Contents of the invention [0003] In view of this, an intelligent production scheduling method is pr...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/04G06Q10/06G06Q10/08G06Q50/04
CPCG06Q10/04G06Q10/0631G06Q10/06393G06Q10/067G06Q10/087G06Q50/04Y02P90/30
Inventor 孙穆歆王金明黄公伟
Owner 深圳坤湛科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products