An integrally assembled bathroom structure
A prefabricated and integrated technology, applied in the direction of building structure, building type, building, etc., can solve the problems of instability, water seepage in the integrated bathroom, poor use effect, etc., and achieve stable installation, better anti-seepage effect, The effect of high practicality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] refer to figure 1 , Embodiment 1 of the present application proposes an integrally assembled bathroom structure, including a chassis 1, a waterproof enclosure 2 installed on the chassis 1, and a top plate 3 arranged on the waterproof enclosure 2; the chassis 1 is a prefabricated integral component; The waterproof enclosure 2 includes four vertically arranged wall panels 21, and the four wall panels 21 are connected end to end to form the waterproof enclosure 2, that is, the wall of the bathroom; a bathroom door is arranged on one of the wall panels 21 for access; the top panel 3 are horizontally arranged on four wall panels 21 to form a relatively closed bathroom space. During installation, the chassis 1 is first arranged horizontally, and then the four wall panels 21 are vertically arranged and surrounded to form the waterproof enclosure 2, and then the top plate 3 is fixed on the waterproof enclosure 2 to get final product.
[0035] refer to figure 2 and image 3B...
Embodiment 2
[0041] An overall assembled bathroom structure, refer to Figure 4 The difference between the second embodiment of the present application and the first embodiment is that the pull-connector 5 includes two second L-shaped plates 52 arranged in the vertical direction and open to each other and a plurality of second L-shaped plates 52 for connecting the two second L-shaped plates 52 to each other. The pulling connection part 53 of pulling knot. The two second L-shaped plates 52 form a distance so that the tool can be inserted between the two second L-shaped plates 52 from the horizontal direction. A plurality of connecting parts 53 are evenly distributed along the length direction of the second L-shaped plate 52; the connecting parts 53 include a coaxial sleeve rod 531 and two core rods 532; and the threads at both ends rotate in opposite directions; one end of the core rod 532 is T-shaped, and the other end is formed with external threads, and the external threads on the two c...
Embodiment 3
[0045] An overall assembled bathroom structure, refer to Figure 5 The difference between the third embodiment of the present application and the second embodiment is that the pulling member 53 includes two permanent magnets 533 located on the same straight line, and the S pole of one permanent magnet 533 passes through the mounting hole 2111 and is fixed to one of the second permanent magnets 533. At the corner of the L-shaped plate 52 , the N pole of another permanent magnet 533 passes through the mounting hole 2111 and is fixed to the corner of another second L-shaped plate 52 . Through the principle of opposite sex attraction of the two permanent magnets 533 on the same straight line, the two second L-shaped plates 52 move toward each other, so that the wallboard 21 has a tendency to move toward each other, and then the elastic waterproof seal 4 is better clamped. When installing the pull-connection part 5, it only needs to ensure that the two permanent magnets 533 of the ...